Top-rated rototilling pros.

Get matched with top rototilling pros in Van Horne, IA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Van Horne, IA?

Select your specific project to find the pro for you.

Find Rototilling pros in Van Horne

K&M Exteriors LLC

3045 200th Trl
No reviews yet

K&M Exteriors LLC

3045 200th Trl
No reviews yet
2 years of experience

The company provides various exterior contracting solutions to meet the needs of every customer. We specialize in decks, porches, fences, outside fireplaces, brick lain walkways, septic tanks, residential utility service repair, environmental remediation, hazmat clean up and much more!

The company provides various exterior contracting solutions to meet the needs of every customer. We specialize in decks, porches, fences, outside fireplaces, brick lain walkways, septic tanks, residential utility service repair, environmental remediation, hazmat clean up and much more!

Rototilling questions, answered by experts

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

Yes, an excavation company is the best option for land grading and yard leveling. General landscapers might be able to tackle these projects, but an excavation company will do a better job because they’re used to operating the necessary heavy machinery. Landscapers might opt to do the work manually, which takes much longer and could cost you more in labor fees. Finally, excavation companies will understand local regulations and know when you need permits to legalize the work, while a landscaper might not.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Typically 1-3 days, depending on property size and terrain condition.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.