Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in Pahala, HI

Enter your ZIP and get matched with up to 5 pros

Need a pro for your concrete leveling project in Pahala, HI?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Pahala

Blue Star Handyman LLC

2517 Puu Road
No reviews yet

Blue Star Handyman LLC

2517 Puu Road
No reviews yet
7 years of experience

Family owned business that has built homes and hotels from ground up. Remodels and additions to existing homes and businesses from Kauai to Kona. We focused on working with your needs and budget to complete your project in a timely manner. We strive to build your project with satisfaction to want to build more.

Family owned business that has built homes and hotels from ground up. Remodels and additions to existing homes and businesses from Kauai to Kona. We focused on working with your needs and budget to complete your project in a timely manner. We strive to build your project with satisfaction to want to build more.



Avatar for Tekton Masonry

Tekton Masonry

P.o. Box 1512
No reviews yet

Tekton Masonry

P.o. Box 1512
No reviews yet
32 years of experience

We take pride in our construction craftmanship. Servicing The Big Island of Hawaii since since 1993, our lifetime clients have been fully satisfied with our quality, turn-around time, and professional service. Let us manage and complete your home or business project. Call or request a free estimate today.

We take pride in our construction craftmanship. Servicing The Big Island of Hawaii since since 1993, our lifetime clients have been fully satisfied with our quality, turn-around time, and professional service. Let us manage and complete your home or business project. Call or request a free estimate today.


Kirn Concrete

6437 Mamalahoa Hwy
No reviews yet

Kirn Concrete

6437 Mamalahoa Hwy
No reviews yet

Kirn Concrete is offering concrete service and Driveways in Kailua-Kona, HI. Just call 808-895-5883 for more information. Masonry Contractor, Architectural Concrete, Concrete Contractor, Concrete Service, Driveways

Kirn Concrete is offering concrete service and Driveways in Kailua-Kona, HI. Just call 808-895-5883 for more information. Masonry Contractor, Architectural Concrete, Concrete Contractor, Concrete Service, Driveways

Concrete Leveling questions, answered by experts

Drying concrete faster after rain is tricky because you’d need to increase the temperature or airflow over your slab, both of which are challenging to do outdoors. It can help to remove water from your concrete quickly, though, as the faster you remove rain from the surface, the lower the risk of the water affecting the ratio of your concrete mix. Use squeegees or mops to remove water, and consider covering your slab with a tarp to protect it from future rainfall.

Yes, concrete countertops are harder to maintain than other materials. You don’t have to stress about them every single day, but they need to be resealed at least once a year, if not multiple times a year. Concrete also stains easily, so you must clean spills immediately. Avoid harsh, acidic cleaning products, as they can damage the sealant. Finally, concrete is prone to cracking over time, requiring repairs.

Yes, you can pour concrete if it rained the day before, but you’ll need to drain the construction site to ensure there isn’t standing water where your slab will sit. You might need to manually remove any puddles and set up drainage on your site to dry it before pouring. Moist soil won’t be an issue, but standing water will throw off your concrete mix ratios. Additionally, ensure there isn’t more rain expected in the near future before you pour.

Sealing the concrete before tiling is recommended to help it stand up against any water that may seep through the tiles or grout. After thoroughly cleaning the concrete with TSP, priming with a concrete primer will seal the concrete. Check the label on the primer to make sure it is also a sealant and follow the manufacturer’s instructions for application.

Poured concrete should be set and hard to the touch within 24 to 48 hours, although it depends on the humidity in the air, the thickness of the concrete, and the type of concrete. It’s best to leave concrete to set for three days before exposing to foot traffic or stress. Concrete takes between 20 and 30 days to cure and reach its peak strength, so for foundations and retaining walls, plan to wait about a month before placing any load on your concrete.

The Pahala, HI homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.