Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Moreland, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Moreland, GA?

Select your specific project to find the pro for you.

TRUSTED BY MORELAND, GA HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon31
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Moreland

Avatar for Ruby's Concrete Services
Ruby's Concrete Services
4.8(
22
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Moreland, GA and surrounding areas

Approved

In business since 2022

Free estimates

Small jobs welcome

"They were fast, efficient and responsive to any concerns we had along the way. They installed two concrete slabs with drains for a pre-fab garage and home office. I will definitely do business with them again."
My Work
My Work
My Work
My Work
My Work

+28

Response time2 days
Response rate89%
3 neighbors recently requested a quote
Avatar for JBD Construction
JBD Construction
5.0(
10
)
Brick and Stone Driveways & Floors - Install

Serving Moreland, GA and surrounding areas

Approved

Super Service Award Winner

In business since 1995

Free estimates

Emergency services offered

"JDB Construction was an excellent choice to repair our stone wall and make other concrete repairs to the driveway. They did an excellent and detailed project on our driveway stone wall, and cleaned up daily during the week long job. The owner is very professional and did almost the entire project himself. I highly recommend this firm."
brick
b
b
b
b

+10

Response time6 hrs
Response rate100%
1 neighbors recently requested a quote
...
Showing 1-10 of 268
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

Depending on project size, typically 1 to 3 days, including preparation and installation.

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

Regular cleaning, sealing, and timely repair of cracks help maintain its condition.

The Moreland, GA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.