Top-rated pre-made cabinet pros.

Get matched with top pre-made cabinet pros in Inverness, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your pre-made cabinet service project in Inverness, CA?

Select your specific project to find the pro for you.

TRUSTED BY INVERNESS, CA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon83
    Verified pre-made cabinet services reviews

Find Pre-made cabinet pros in Inverness

Avatar for Ovation Restoration, LLC
Ovation Restoration, LLC
4.2(
102
)
Cabinets - Reface

Serving Inverness, CA and surrounding areas

Approved

In business since 1997

Free estimates

Emergency services offered

"Ovation manages client contracts and finances while Unique Interiors (Kris Tavares) crews do the work. Overall, the construction was of average quality, and am I generally satisfied with the results. Most workers were timely, friendly, and cleaned up after themselves. However, there were a number of issues of missed timelines, demands for early payments (although the total paid was as agreed). Several of the subs or workers were problematic and callbacks from both Ovation and Unique were difficult. His work was often installed where other work was planned. As a result, his work needed redoing. Because he was rarely quickly available to fix his mistakes, these erred installations significantly increased the project duration. He rarely cleaned up after himself, leaving scraps, and construction debris left where he worked requiring other workers or the homeowner to clean-up. His worst mistake was drilling a 3 ½ in a hole in an array of standard 2X4s to accommodate a 2 in conduit to pass through. The result was that the involved wall required reconfiguring to ensure structural soundness. This event was complicated by his using brute force to remove a frozen stud in an electrical meter base, which then broke off. Instead of drilling out the broken stud, he ordered a new service, which necessitated a two-week period with no electricity to the house. Not only did this delay the project, if necessitated people living here to vacate during this time and required use of an extension cord from a neighbor to keep the refrigerator and freezer running. This alone was cause for a 3-week delay in the overall project. A number of other delays were the result of materials not ordered in a timely manner so that when workmen were assigned, instead of beginning work on the ordered materials, they had to go find what was needed at the store. In some cases, this required ordering materials that were back-ordered, adding to the delays. It must be said that this small project was originally projected to have an elapsed completion time of 1 month. In all, the project took over 4 months with many interim completion dates given and passed. These delays were complicated by two international trips the owners took, one of which I hired a person to oversee construction in my absence, the second because of problems in my first absence, I halted construction for 3.5 weeks while I was gone. The person hired to install cabinets, which were very nice quality, were hung in a very unprofessional manner with screw heads exposed inside the cabinets and many of these proud of the cabinet wall, which prevented me from using screw covers. About cabinet designs: I was presented a cabinet plan and pressured to approve it. We discussed the plan and made some agreements of the changes needed and I signed off. Unfortunately, all the changes we discussed were not followed and some original designs were ordered. This was my error for signing off to a plan without better documentation of the oral changes.Part of the plan was the installation of a shallow counter that needed custom fabrication. The finish material had to be repaired and this did not work so it was agreed to replace the counter as warranty work after the project was completed. The person who built this also undertook the redo. The final quality of the work was very poor. The counter was somewhere from ¼ to 1/8 inch away from the wall. He attempted to fill the gap with silicone and smeared it on both the wall and the counter. He left the redo in this condition without letting the owner know he was going. I reported this issue to both Ovation and Unique, without any response. I had to make the repair on the counter myself."
Breathtaking solid slab granite countertops
Walk-in shower with sliding glass door
Handicap accessible with style
New lighting
Antique white custom cabinets

+133

Response time10 hrs
Response rate96%
1 neighbors recently requested a quote
Avatar for Management Design V. Brothers Corp.
Management Design V. Brothers Corp.
5.0(
2
)
Cabinets - InstallCabinets - RepairPre-Made Cabinets - Install

Serving Inverness, CA and surrounding areas

Approved

In business since 2000

Offers commercial services

Customers say: Quick response

MANAGEMENT DESIGN V. BROTHERS CORP is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business \n

Bathroom remodel
Custom built in cabinets
New bathroom shelves and title
Installation of shower glass, lamps and mirrors
Built- in cabinets

+14

Response time2 days
Recommended by50%of homeowners
JOHN'S FURNITURE & CABINETS
4.7(
29
)
Cabinets - InstallCabinets - RefaceCabinets - Repair+1 more

Serving Inverness, CA and surrounding areas

In business since 1983

"All in all it has gone extremely well. Like any major remodel, there were always a few hiccups, but John always agreed to a fair and economic solution. I can't say enough good things about John's integrity and professionalism. He's a master craftsman, the 11 ply Baltic Plywood construction is of the highest quality, finish and construction. John provides custom quality cabinets at prices that are equal or less than Big and small box store competition. His installation costs are also usually well below his competitors.. John can build fine furniture, not just kitchen cabinets, he's an excellent craftsman."
Custom Kitchen Cabinets
Custom Home Entertainment Center
Custom Fireplace
Recommended by92%of homeowners
Palm Construction, Inc.
5.0(
90
)
Cabinets - InstallCabinets - RefaceCabinets - Repair+1 more

Serving Inverness, CA and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"We worked with Ali (sales manager) and Tony (project manager), who took the time to design a project that made sense for our property and our budget, made a number of suggestions and recommendations and were never pushy or tried to "sell" us on something. The crew really went above and beyond to provide top quality workmanship and overall we were in very good hands. Highly recommended!"
Recommended by100%of homeowners
First Stop Construction, Inc.
4.4(
30
)
Cabinets - InstallCabinets - RefacePre-Made Cabinets - Install

Serving Inverness, CA and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Would highly recommend First Stop Construction! We were able to transform a small kitchen into an attractive and functional space. Tom was very responsive and a huge help in the design process given his knowledge. They manage timing in your project for electrical, plumbing, cabinets, counters, paint, etc, in the best way. Our project was timely, professional, and they kept a clean workspace. Great company!"
Remodeling
Remodeling
Remodeling
Remodeling
Remodeling

+17

Response time9 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 65
Pre Made Cabinets questions, answered by experts

The time it takes to install new cabinets depends on the scope of the project. For a kitchen installation, you can expect the process to take anywhere from 2-5 days for a standard layout up to a couple of weeks for more complex projects, depending on the number of cabinets and the installation space. For a smaller project, such as installing cabinets in a bathroom, you can expect the work to take a week or less. Your cabinet installation expert will be able to provide you with a realistic timeframe.

Like nearly any other upgrade, new and improved kitchen cabinets can increase your property value and make your home more attractive to potential buyers. After all, the majority of home buyers consider the kitchen to be one of the most important rooms in the house. New melamine cabinets can be a big plus, particularly if you select a classic wood grain or another light neutral color that provides a blank slate for other design elements.

To estimate the cost of your kitchen cabinet installation, measure along the wall where you want your cabinets to be. Add up the linear feet, remembering to include both upper cabinets and lower cabinets in your total. Then, calculate the cost by multiplying the average price per linear foot of the type of cabinet you plan to install by the total length you measured.

There are some tips when hiring a cabinet installer that’ll help prepare you to create a new space. When installing new cabinets, keep the following in mind:

  • Hire the same cabinet installer professional to measure, design, and install the cabinets, as opposed to jumping between companies. 

  • Discuss what types of cabinets the installer offers, including stock, semi-custom, and custom, to give yourself options.

  • Discuss financing options with your installer, as this project can be expensive depending on your chosen cabinets.

  • Discuss your cabinet installer’s prior experience, including asking for photos of previous projects. 

Yes, most installations include warranties for materials and labor. Confirm details with your contractor.

The Inverness, CA homeowners’ guide to pre-made cabinet services

From average costs to expert advice, get all the answers you need to get your job done.