Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Forest Falls, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Forest Falls, CA?

Select your specific project to find the pro for you.

TRUSTED BY FOREST FALLS, CA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon99
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Forest Falls

Avatar for Best Quality Movers
Best Quality Movers
5.0(
299
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Forest Falls, CA and surrounding areas

In business since 2009

Credit card accepted

"The crew was a bit late to get started, but did a good job once they arrived. They carried my stuff up to the 3rd floor since the elevator was very small. 
Had some trouble putting the bed back together but overall a fine job. Some damage to my items, but don't know where along the line that happened. It could have happened in transit.
"
Movers getting armour
Additional Photos
Additional Photos
Additional Photos
Recommended by94%of homeowners
Avatar for Just Do It Builders Inc
Just Do It Builders Inc
4.4(
215
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Forest Falls, CA and surrounding areas

In business since 1991

Free estimates

Credit card accepted

"

From the first visit with the sales person to the last people who did the installation we found them to be true to their word and

extremely capable , trustworthy and true to their word.  The Job was completed in

a li8ttle more than two hours and we are extremely satisfied with the finished job.  We would highly recommend them.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by70%of homeowners
Avatar for ESI General Construction Inc
ESI General Construction Inc
3.9(
232
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Forest Falls, CA and surrounding areas

In business since 1979

Free estimates

Emergency services offered

"I bought the Angie's List special for a 3D drawing for our bathroom remodel.
We have not started any work yet and not sure if we will go with General Construction to do the work, still getting other bids, Project Manager was great to work with and his design gave us a really good idea of  what our bathroom could look like.
"
kitchen in tarazana
Recommended by73%of homeowners
Crystal Pool & Spa
3.9(
11
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Forest Falls, CA and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"We had Crystal Pool & Spa quote and then remodel our existing in ground plaster pool.  They were quick to do estimates, they only do it via email.  They were able to look up the build records of our pool and then quote the remodel based on size.  The pool is approx 15' wide by 32' long with 9' deep end and 3' shallow end.  There is a tiny spa, but the old homeowners removed the heater.  The Spa barely holds one person, so we opted to remove the spa wall and make a seating area for the pool.  CPS was quick to quote, started work in about two weeks and it took two weeks to finish.  Took a little longer since the tile we originally wanted was out of stock and took a few days to get tile samples as well.  Overall, all the crews worked quickly and hard and did an excellent job.  Two weeks start to finish until the pool was full of water

They left the backyard pretty clean afterwards, but the plaster guys left some plaster material in a flower planter bed, that was empty.  So I am left with cleaning that out.  Everyone was very nice and professional and the work went smoothly, very hassle free."
Recommended by88%of homeowners
Avatar for Hanks Construction
Hanks Construction
4.4(
43
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Forest Falls, CA and surrounding areas

In business since 1978

Free estimates

Emergency services offered

"They installed sliding glass door for me. They did a poor job of it. While framing it, they ignored or grossly misread the structural engineer's drawings (failing to install a column attached to the ground), which seemed incredibly dangerous. They only installed it after my wife noticed it before they covered it up, and then they still needed me to verify with the structural engineer that a column should actually go all the way to the footing. Thank God my wife saw it. They left trash and debris everywhere throughout the project. They also improperly sealed the door, and now it leaks whenever it rains. We have tried to call them to fix the seal around the door multiple times. They said they would fix it, but now they simply do not return our calls. Avoid this contractor!"
Recommended by85%of homeowners
Avatar for Real Construction
Real Construction
4.2(
36
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Forest Falls, CA and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"Real Construction did an amazing job on my kitchen, closets, bathrooms and pavers. I worked with ASI for the design portion and Sion as my contractor. They were incredibly helpful and always responded to my questions. RC handled everything from start to finish, so I never had to worry about anything. I gave Sion a budget and a general idea of what I wanted, and he helped me design a kitchen that exceeded my expectations. My backyard is amazing with new pavers and gazebo. RC upgraded our pool and installed lights. Sion stayed within my budget and timeline. Every aspect of this renovation was handled with the highest level of care, responsibility and professionalism. We are very happy with Real Construction and we're highly recommending them to all my family and friends."
Santa Barbara, CA
Kitchen
Kitchen
Additional Photos
Additional Photos

+17

Recommended by86%of homeowners
Avatar for T.N.L. Construction Inc.
T.N.L. Construction Inc.
5.0(
9
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Forest Falls, CA and surrounding areas

In business since 1983

Emergency services offered

Credit card accepted

"

my wife was nagging me for the last couple of years  to upgrade the kitchen's look so that was my initial job

we had a very pleasant  meeting with tnl's manager meir.

we went over our needs and wants and the budget of course

the kitchen was very old (about 16 years) we a couple of idea's to keep it white and clean , and meir suggested to add some color accents and a different style for the kitchen cabinets.

we loved the ideas , and my wife had to ask meir about our master bathroom , he came out with a great idea for it with a small budget.

we had another meeting going through the details and the job started a week later.

the work was done to our satisfaction , the employees were extremely nice , cleaning all the daily building materials

along the way we decided to go with LED lights (saves money and good for the environment ) 

we picked new cabinets for the kitchen with meir's referral so we got a great deal on that and we were able to give the kitchen a bit more storage space because of the smart storage system we choose.

we installed gfci outlets that we didn't had before, new appliances (stainless steel) ,ceramic counter tops and ceramic tile for the flooring.

the color for accents was light mocha.

the master bathroom was repainted with almond cream' color, the faucets were replaced , new shower curtain and accessories installed.

new switches and laminated wood was installed on the floor.

the rest of the house was painted Navaho white, we replaced most of the switches and outlets to newer ones.

meir's team did a wonderful job and we even got it completed couple of days before.

our place looks great and feels like the house we always wanted , we already recommended TNL construction to our friend.

project ended 8/8/2014



"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Showing 1-10 of 47
Install Above Ground Pools questions, answered by experts

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

Installing an infinity pool takes up to 12 weeks. It can take as long as 20 weeks if you have a complex design, are building a pool in an inaccessible area, or face weather-related construction delays. Either way, this is a big job that requires a lot of time and labor to get it right. Pool construction is not a job that should be rushed, as poor installation can lead to expensive recurring repair costs. 

Pool leak detection dye is a great way to test specific areas of your pool for unbalanced water flow. By releasing the dye close to possible trouble areas—like around the seal of the skimmer—you can narrow down the potential crack. However, it's best to call a professional pool repair team near you if an initial patch does not keep your water level from lowering.

At noon, when the sun is at its highest point, sunlight can naturally increase the temperature of a pool by 0.7 degrees each hour, but this can depend on other external factors. For example, evaporation caused by the sun will cause a pool to lose up to 5 degrees for every 1/2 inch of water evaporated. Using a water heater will produce more reliable results.

Generally speaking, you should expect to wait 24 to 48 hours after filling a pool before you use it. However, the actual timeline depends on a few factors. Most importantly, you need to shock the water with chlorine or an alternative to swimming pool chlorine and let the concentration come down to a safe level before using the pool. Additionally, most water sources will be cold, and it can take days before the sun or your pool heater warms your water to a comfortable temperature. Alternatively, getting water professionally delivered could have you swimming in just a few hours.

The Forest Falls, CA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.