"I hired this company to design my backyard landscape and they did a fantastic job. The designer was creative and came up with a beautiful plan that incorporated all of my ideas. The installation process was seamless and the team was professional and efficient. I now have a backyard that I can be proud of and enjoy all year round. I highly recommend this company for anyone looking to enhance their outdoor space."
"Outstanding experience with Jim and team. We have had driveway issues since we first bought this house last year. Thanks to Asphalt Aces, those issues have been solved and we now have a beautiful 300ft driveway on our property leading up to the house. 10/10 would recommend."
"Excellent Service from planning through Execution and installation to final fine tuning. The folks communicated well and explained every detail of the step. Got permit and inspection done. It was seamless. Thanks. R."
"Josh is amazing! He was very helpful and skillful. We had many things that needed to be installed/repaired. He completed everything that we asked in a professional manner. "
"Very professional. Completed the job in two weeks. The deliverables were as promised. They were very independent, requiring only minimal involvement from the client. However, communication with the owner could be enhanced a bit."
"We had Ocean Seven Builders redo our roof after a small leak turned into a bigger problem. Ron was the one we dealt with, and he just felt easy to talk to from the start. No pressure, no upselling, just explained what made sense. The crew showed up when they said they would and worked pretty steadily through the job. What I noticed most was how clean they kept things?no nails or trash left around. The roof looks great and we?ve had zero issues since."
"Raul fulfilled our request to plow out our driveway efficiently and on time, which was a blessing as we were arriving after a 5 hour drive and it was nice to be able to drive right up to the house without having to shovel snow."
"It went very well. Everyone was very informative. They kept me up to date with the process and whenever I had a question, they were really prompt with their answers whether by email or phone. They were on time when they say they will begin work and the guys that installed my solar panel and inverters were very clean. I mentioned that I'm very worried about leaks because my son is very sensitive to mold and they made sure to seal everything very well n show us the work they've done and ask if we see anything that needs to be addressed. I was very pleased with the whole process. And it was easy, they took care of everything."
In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.
New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.
Yes, with colored finishes and decorative stamping for a personalized touch.
While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.
When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:
How many years of experience do you have?
Are you licensed, bonded, and insured?
Do you have worker’s compensation?
Do you use subcontractors on your projects?
Do you clean up after the job is done?
Who is responsible for any damage to lawn or landscaping?
Do you provide a guarantee or warranty on your work?
Do you give free estimates?
What is the timeline for completion?
How do you handle change orders?
Can you provide at least three references?
Can I see some of the work you’ve done?
The Coleville, CA homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.