\nCommercial cleaners will take out your trash, clean the floors, sanitize the bathrooms as well as eating spaces, and will do other types of light cleaning on a regular basis.\nDaily, Weekly and Monthly Cleaning Services\nFloor Cleaning\n \nCeiling Cleaning\n \nWindow Cleaning\n \nOffice Cleaning Services\n \nWaste Removal\n \nKitchen and Restroom Cleaning\n \nSanitization Programs\n \nDaytime and Nighttime Cleaning

Concrete Mudjacking questions, answered by experts

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

Polyjacking and mudjacking can both be effective solutions for sinking concrete, but they have key differences. Polyjacking, which uses expanding polyurethane foam, is often considered a better option because the foam is significantly lighter than the cementitious material used for mudjacking. This reduced weight puts less pressure on the underlying soil and lowers the risk of future sinking. Polyjacking is suitable for any sinking concrete slab, while mudjacking is typically only recommended for non-structural concrete, such as sidewalks, patios, pool decks, and driveways. The primary drawback of polyjacking is its cost, which can be up to four times higher than mudjacking—as much as $25 per square foot compared to a maximum of about $6 per square foot for mudjacking.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Quartzsite, AZ homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.