Top-rated basement remodelers.

Get matched with top basement remodelers in Dateland, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dateland, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Dateland

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Dateland, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
A granite source
New to Angi
Basement - Remodel

Serving Dateland, AZ and surrounding areas

\nHello, my name is Andrik from "A Granite Source"! We are a start up, brand new company based in the phoenix area, although we recently started we are still very much experienced, with our lead installer having over 25 years of experience! I was hoping to maybe become a new fabrication and installation source for your new builds, all we ask is for a chance. We are much cheaper than other big corporations and offer the same, if not better than, their work starting at $35 a sqft. If you have any questions or concerns please reply to this email or contact me via phone at, (480) 652-3625. Below I have attached a couple of pictures of our work. We hope to hear from you, thank you.

Basement Remodel questions, answered by experts

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Dateland, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.