Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Hazen, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Hazen, AR?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Hazen

Avatar for Groundworks
Groundworks
5.0(
9
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Hazen, AR and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Warranties offered

"We had the opportunity to meet Bobby Dugger, AND look at our problems and he and partner went straight to work assessing the job , They both were VERY professional and Informative, Explained everything and even found things we knew nothing about, I'm sure we will be PLEASED with the finished work, I would definitely recommend them. Very professional at what he does, THANK YOU GROUND WORKS."
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Concrete

+15

107 neighbors recently requested a quote
Avatar for Redeemers Group, Inc.
Redeemers Group, Inc.
3.8(
28
)
Concrete - Injection Leveling - Mudjacking

Serving Hazen, AR and surrounding areas

Approved

In business since 2007

Free estimates

Emergency services offered

"They came when they said they would. The price was reasonable. Very nice and professional. The only The problem I had was they could have done a better job on the cracks. Other than that they did a good job. I would recommend them."
Interior Cracking
Crack Closed
Uneven Concrete
Concrete Repaired
Wet Crawl Space

+7

Response time6 hrs
18 neighbors recently requested a quote
Recommended by64%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Concrete leveling is absolutely worth it if you have sunken concrete slabs and want to restore them to level, especially if the slab is part of your home foundation. Concrete leveling is less than half the price of replacing concrete sidewalks, patios, walkways, and pool decks, and it’s about a quarter of the cost of replacing a foundation. If you also treat the underlying problem, it can be a worthwhile and permanent solution.

The Hazen, AR homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.