Top-rated basement remodelers.

Get matched with top basement remodelers in Goshen, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Goshen, AR?

Select your specific project to find the pro for you.

TRUSTED BY GOSHEN, AR HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon10
    Verified basement remodels reviews

Find Basement remodelers in Goshen

Avatar for Wilson Home Services, LLC
Wilson Home Services, LLC
4.0(
68
)
Basement - Remodel

Serving Goshen, AR and surrounding areas

Approved

In business since 2016

Free estimates

Emergency services offered

"The company was very responsive and quick to estimate and schedule. The man arrived on time and with everything he needed to complete he job. We will definitely h.ire them again"
Kitchen Remodel
Interior View
Interview view with customer doors
Exterior View
Exterior View

+6

Response time1 day
36 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Cold River Contracting LLC
Cold River Contracting LLC
5.0(
2
)
Basement - Remodel

Serving Goshen, AR and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

"In and out very fast and clean! Quartz countertops are beautiful and fit perfectly. The build is really nice quality. They also suggested elements for the design of kitchen we weren't sure about. Specifically the cabinet layout. Daniel had the perfect suggestion for how to layout the cabinets. Very pleased with the experience!"
Project Photos
Courtyard Addition
Courtyard Addition
Courtyard Addition
Courtyard Addition

+42

9 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Double Down Construction
Double Down Construction
4.5(
30
)
Basement - Remodel

Serving Goshen, AR and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Work went really well, I asked for some things that were a lil outside the box such as the niche across the entirety of shower and some countertops that were new to them.. they took the time to research and implement, i was very happy with the results.. the thing i think i can appreciate the most though is that when the job called for 1 guy there was 2 guys and when it called for more there was 5 guys, bathrooms were done on time.. it wasn’t 1 guy taking 8 weeks to remodel 2 bathrooms"
Residential Remodel
Full Bathroom Remodem
This Owners dream kitchen!
Dream come true!
Residential Remodel

+25

Recommended by93%of homeowners
Avatar for Lost Sheep of Israel Handyman Ministry
Lost Sheep of Israel Handyman Ministry
4.7(
20
)
Basement - Remodel

Serving Goshen, AR and surrounding areas

In business since 2012

Free estimates

"The job was done very well. Our ceiling looks new again like there was no damage before. I also like that he made sure the surrounding area were all well protected from potential damages before starting his work. Steven is also kind and trustworthy."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by94%of homeowners
Ahmed Construction LLC.
5.0(
6
)
Basement - Remodel

Serving Goshen, AR and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"It has been a pleasure to do business with Ahmed construction. They provide very fair price on bidding. The administrative project manager Mr Albert is a hard working guy. Him along with the Mr Judy did the decking and replaced some studs on an addition remodel project. I highly recommend Ahmed construction and I will hire them again for any future project"
Builders - Garages/Barns/Sheds Project
Builders - Garages/Barns/Sheds Project
Builders - Garages/Barns/Sheds Project
Builders - Garages/Barns/Sheds Project
Recommended by100%of homeowners
...
Showing 1-10 of 52
Basement Remodel questions, answered by experts

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

The Goshen, AR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.