Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Thomasville, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Thomasville, AL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Thomasville

Avatar for American Property Works
American Property Works
4.1(
23
)
Concrete Driveways - Install

Serving Thomasville, AL and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"These guys are unbelievable! We had major water issues in our yard and we hired them provided drainage capabilities that would move the water from our yard to the gutter in the street. They not only did an outstanding job, they worked in the rain, thunder, and lightening to get the job done. They solved our problem. We worked with Jake and words can't describe how helpful, courteous, and conscientious he is. There was a lot of excavation involved and they were really efficient, replacing all our sod and then cleaning up after themselves. I would enthusiastically recommend this company."
French drain
Side view
Channel Drain
Swale
Response time2 days
Recommended by82%of homeowners
Avatar for Get By Patch
Get By Patch
5.0(
6
)
Asphalt Paving - Repair or Patch

Serving Thomasville, AL and surrounding areas

In business since 2020

Free estimates

Small jobs welcome

"They done an amazing job! Got the job done efficiently and it looks amazing now! We couldnt be happier! Would recommend to anyone for anything asphalt-related! Not to mention their customer service was absolutely amazing, very nice people. Great company all the way around!!!"
#1 pothole patching
#1 pothole patching
#1 pothole patching
#1 pothole patching
Response time3 days
Avatar for J And B Equipment, LLC
J And B Equipment, LLC
3.0(
2
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+3 more

Serving Thomasville, AL and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Wonderful. We had a contractor do us wrong on our roof two years ago. Jonathan and Brandy took the tin off and rebuilt all the braces and fixed it perfect. He and his crew did a wonderful job at a great price. I will call him for anything I need. He does great quality work."
Clean up after storm
Driveway
Clean up after storm
Recommended by50%of homeowners
Showing 1-10 of 34
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Thomasville, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.