Top-rated solar panel pros.

Best solar panel pros near Foley, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Foley, AL?

Select your specific project to find the pro for you.

Top-Rated Solar panel pros in Foley - Updated Nov 2026

Avatar for Surfside Services
Surfside Services
4.8(
18
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Foley, AL and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"Surfside Services really made the whole process of getting a generator very easy for me. I never knew there were so many steps. But luckily they handled it all from start to finish and I did not have to worry at all. Thank you Surfside Services. I will be using you for all my home service needs!"
Heating & A/C Project
Simple Landscaping
Generator Install
Installing Recessed Lighting
Installing A Shower Drain

+39

Recommended by93%of homeowners
Avatar for Dish Network Retailer Satellite Country
Dish Network Retailer Satellite Country
4.0(
283
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Foley, AL and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"I was very impressed with the installer who was sent. He mounted the dish without drilling through my new roof, which might have voided my roof warranty, Also, he mounted the dish in a location where it is easy for me to brush the snow off it in winter. I appreciate his knowledge and thoughtfulness. Also, they didn't charge me to re-install the dish."
Dish Options
Recommended by74%of homeowners
Showing 1-10 of 28
Solar Panels FAQs, answered by experts

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

Ideally, you want to place them facing true south. This is different from what a compass shows, which is called the magnetic south. You can find true south by using an online calculator as long as you know the longitude and latitude of your property. Solar panel placement is key to maximizing the energy you generate, so this is an important step.

If you’re deciding between a solar battery versus a generator for the best backup power solution, you can take a few factors into consideration. Solar batteries are quiet while generators can be quite loud. Generators have a lower up-front cost, but they require fuel and ongoing maintenance while solar batteries are more expensive but don’t have many ongoing costs.

Homeowners replace their solar panels after 25 years. That said, you don’t necessarily need to replace them at the 25-year mark. You’ll notice a declining ability to produce electricity over time. Most homeowners spring for a replacement when they notice their energy bills creeping up to regular levels or when solar panel repairs are extensive, frequent, and no longer economical.

The Foley, AL homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.