Top-rated excavation pros.

Get matched with top excavation pros in Coker, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Coker, AL?

Select your specific project to find the pro for you.

TRUSTED BY COKER, AL HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon16
    Verified excavation services reviews

Find Excavation pros in Coker

Avatar for Landscape Additions of Central Alabama, LLC
Landscape Additions of Central Alabama, LLC
5.0(
7
)
Excavation - Major Grading or ReslopingLandscape - Minor Grading or ReslopingExcavation - Major Grading or Resloping - For Business

Serving Coker, AL and surrounding areas

Approved

In business since 2016

Free estimates

Credit card accepted

"Jimmy, Josh and their crews took a jungle of a back yard and made it beautiful. The designed and did the entire project. We have received dozens of compliments from our neighbors as well as the City Inspectors. The built the retaining wall and waterfall, did the grading and installed the complete drainage and irrigation systems. Their price was very fair and concrete began the project they stayed on the job until they finished. I would give them six stars if I could. Highly recommend them for all landscape related projects. Rodgers M."
Pondless waterfall
Pondless waterfall
Pondless waterfall
Pondless waterfall
Pondless waterfall

+5

9 neighbors recently requested a quote
Avatar for Natdawgs hauling &excavating llc
Natdawgs hauling &excavating llc
5.0(
1
)
Building Site - Preparation and ClearingLandscape - Minor Grading or ReslopingExcavation - Major Grading or Resloping

Serving Coker, AL and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

I’ve been doing tree and skid steer work for about 20 years, customer satisfaction is my goal. The job is not complete until you, the customer, are happy. I am a perfectionist, I like and want stuff done right! I am willing to travel almost anywhere within the state. I am highly efficient in a skid steer and working out of a bucket truck..

Baker Farms
Wendling property
Teresa’s property
22 neighbors recently requested a quote
Avatar for TNT Mulching & Dirtwork
TNT Mulching & Dirtwork
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingBuilding Site - Preparation and Clearing - For Business+2 more

Serving Coker, AL and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n\nCall us today you'll be pleased you did. Thank you!\n

Response time4 hrs
2 neighbors recently requested a quote
...
Showing 1-10 of 92
Excavating questions, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Trenching is a specific kind of digging. Trenching means digging a depression in the earth that’s deeper than it is wide, often with heavy machinery. Digging refers to any kind of removal of earth in order to create a human-made depression, hole, or cut in the earth’s surface. You can dig with big tools or even with just a hand shovel.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Coker, AL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.