Top-rated basement remodelers.

Best basement remodelers near Douglas, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Douglas, WY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Douglas - Updated Nov 2026

Avatar for Alex Polanski Construction LLC
Alex Polanski Construction LLC
5.0(
1
)
Basement - Remodel

Serving Douglas, WY and surrounding areas

Approved

In business since 2021

Free estimates

Pick AP Construction for the highest level of quality craftsmanship. We have been in the construction field for over a decade and do everything from new buildings to remodels and repairs. We also specialize in custom carpentry. Licensed and insured. Call us today to make your dreams come to life.

Deck
Deck
Deck
Deck
Deck

+4

Response time6 hrs
Response rate96%
2 neighbors recently requested a quote
Avatar for Slide Lake Enterprises Inc
Slide Lake Enterprises Inc
New to Angi
Basement - Remodel

Serving Douglas, WY and surrounding areas

Approved

In business since 2010

Free estimates

Offers commercial services

Customer satisfaction, is what determines our success, which is why we take a hands-on approach. When interacting with Wind River Stone Scapes, Inc., you will notice that we are particularly focused on the principles of quality workmanship, timely completion, competitive pricing and integrity, in all our business dealings. We combine knowledge and research, with our extensive practical experience, to ensure a specialized approach for your project needs. Contact us today for a fair and accurate estimate of your project. We look forward to adding you to our long and growing list of happy customers.

Hardscapes Photo Album
Hardscapes Photo Album
Hardscapes Photo Album
Hardscapes Photo Album
Hardscapes Photo Album

+94

3 neighbors recently requested a quote
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Douglas, WY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 35
Basement Remodel FAQs, answered by experts

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The Douglas, WY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.