Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Salem, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Salem, WV?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Salem

Avatar for TCB Paving LLC
TCB Paving LLC
4.3(
73
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Salem, WV and surrounding areas

Approved

Super Service Award Winner

In business since 1989

Free estimates

Warranties offered

"TCB applied asphalt over existing driveway to level dips and irregularities. Richard was prompt in his initial reply, quoted over the phone, and started the job the next day. Crew was personable, efficient, and tidy. Driveway looks nice.."
Asphalt
Paving
Blacktop
A
B

+8

Response time2 days
151 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for Hall Construction
Hall Construction
4.7(
31
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Salem, WV and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Small jobs welcome

"Hall Construction was really quick to call me back when I was trying to find someone to fix my parents driveway. It was really hard on the vehicles trying to go up or down the driveway.. He quoted me a price and came out the following week to complete the work. He communicated well, and got he job completed in just a few hours. The gravel he put down looks good and there are no issues getting up the driveway now. Quick, efficient, reasonably priced. Very nice. I would 100% recommend!!"
Hall Custom Home
Hall Custom Home
Hall Custom Home
Hall Custom Home
Hall Custom Home

+3

Response time1 day
10 neighbors recently requested a quote
Recommended by82%of homeowners
Avatar for BushCo, LLC
BushCo, LLC
5.0(
7
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Salem, WV and surrounding areas

In business since 2022

Free estimates

Small jobs welcome

"All work was done in a professional manner. The project was timely commenced and completed with no delay. The trees involved were over 100 years old and very big. The crew were experienced and properly trimmed out huge limbs without damage to the trees or the area around them."
U-Shaped Driveway
Pond Completion
88 Foot Long Pond Dam
New Driveway Install
Land Clearing and Ditching

+9

Response time1 day
Recommended by100%of homeowners
Showing 1-10 of 40
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Whether you should resurface or replace your asphalt driveway heavily depends on its condition. If the foundation is solid and the damage is minor, resurfacing is your best bet because it’s more affordable and faster than replacing the driveway. But if your driveway has foundational problems and/or severe damage, like large, deep cracks and potholes, then it makes more sense to replace it. 

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Salem, WV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.