Top-rated flooring contractors.

Get matched with top flooring contractors in Lavalette, WV

Enter your zip and get matched with up to 5 pros

Find Flooring contractors in Lavalette

Avatar for Gleason's Home Repair
Gleason's Home Repair
New to Angi
Laminate Wood or Stone Flooring - RepairVinyl or Linoleum Sheet Flooring or Tiles - RepairWood Flooring - Repair or Partially Replace

Serving Lavalette, WV and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I’m a reliable, detail-oriented contractor dedicated to delivering quality work that lasts. I take pride in doing the job right the first time, whether it’s a small repair or a full project. I believe in honest communication, fair pricing, and showing up when I say I will. My goal is simple: leave every customer satisfied and confident in the work done on their home.

Breaker box upgrade
Breaker box upgrade
Breaker box upgrade
Addition
Addition

+2

One Man Freelancing
New to Angi
Carpet - Repair, Refasten, or StretchLaminate Wood or Stone Flooring - RepairVinyl or Linoleum Sheet Flooring or Tiles - Repair+1 more

Serving Lavalette, WV and surrounding areas

Approved

I am a young business owner and brand new father! I have worked all over the construction industry from a young age and became a licensed plumber before I finished highschool. The name “One man” Freelancing was inspired by my service in the WV national guard where I still currently serve as the “one man” a term given to the cannon crewmember who loads and fires the artillery cannons. I have a broad range of knowledge and problem solving skills, if I don’t know how to do the job I will surely be able to learn and you will not be disappointed with results!

Avatar for Chuck Huggins Inc
Chuck Huggins Inc
4.4(
25
)
Wood Flooring - Install or Completely ReplaceWood Flooring - Install or Completely Replace - For BusinessWood Flooring - Refinish+3 more

Serving Lavalette, WV and surrounding areas

In business since 1992

Free estimates

"Chuck returned my call within 2-3 days and came over and we discussed what needed to be done. He returned with an estimate within a day or two. We arranged for a start date and he and his team were on site at the agreed upon day and time. They pressure washed all the woodwork, ceiling and siding on the porch; they scraped, caulked and primed. There was a lot of scraping, especially the wood railings. A lot of attention was paid to the prep. Everything was topped off with a couple of coats of beautiful paint. They even suggested a wonderful contrasting color for the brickwork which turned out very nice. In addition, they cleaned and painted the concrete steps as well as filled in some gaps with concrete between the steps and the foundation. I was very please with how they cleaned up everything when they were done too. The job was done in 3 days."
Brochure 1 of 2
Brochure 2 of 2
Before
During
After

+11

Recommended by100%of homeowners
...
Showing 1-10 of 56
Flooring Installation questions, answered by experts

While not always required, experts recommend removing baseboards before removing old carpet and installing a new one. This practice leads to a smoother process and a cleaner, more professional-looking finish. Removing the baseboards allows for a seamless carpet installation without the risk of damaging either the carpet or the trim. It also provides a good opportunity to repaint or stain the baseboards and inspect the underlying wall for any issues. If you prefer a quicker option, you can carefully cut the old carpet along the edge of the baseboards, but this may result in a less polished installation for the new carpet.

You can lay your laminate flooring in whichever direction you'd like. However, you should check your materials' instructions and see what the maximum length limit is for the installation. This differs according to the brand you buy, but you can expect it to be around 40 linear feet. Depending on the size of the room, this might dictate which direction you end up laying the planks.

Contractors commonly install floors before cabinets during a kitchen remodel. It’s the standard option when installing hardwood, vinyl, and tile flooring. Installing flooring first helps prevent height misalignment, ensures a seamless appearance, and saves extra flooring work and costs if you plan to replace or remove any cabinets later.

Laminate flooring takes about 24 to 48  hours to settle. Before this, planks are not completely acclimated to your home, and walking on them could cause shifting and permanent damage to the flooring. You should allow floorboards to acclimate for 48 to 72 hours before installing so that they can adjust to your home’s humidity and temperature levels, but they will continue to acclimate and settle after installation. For this reason, avoid placing any furniture in the room for 72 hours after installation.

Your floors will continue to settle for a few months after installation, becoming less bouncy as they rest.

DIY installation is challenging; professionals ensure proper fitting, adhesive application, and long-term durability.

The Lavalette, WV homeowners’ guide to flooring services

From average costs to expert advice, get all the answers you need to get your job done.