Top-rated deck maintenance specialists.

Get matched with top deck maintenance specialists in Rothschild, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your deck maintenance project in Rothschild, WI?

Select your specific project to find the pro for you.

Find Deck maintenance specialists in Rothschild

Avatar for Rays Property Maintenance LLC
Rays Property Maintenance LLC
New to Angi
Deck, Fence, Patio or Porch - Clean and Seal

Serving Rothschild, WI and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

I’m a dependable, hardworking handyman focused on providing quality work, clear communication, and honest service. I have experience with a variety of home improvement and property maintenance projects, and I take pride in showing up, doing the job right, and treating every home with respect. My goal is to help homeowners, landlords, and property managers with reliable service they can count on for repairs, maintenance, and improvement projects.\n

Avatar for Eagle Improvements
Eagle Improvements
3.5(
6
)
Deck, Fence, Patio or Porch - Clean and Seal

Serving Rothschild, WI and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"He comes too early to plow and I have to go out later and blow the end of the driveway and mailbox area. Also the driveway was not plowed out wide enough. If I have to go out and snowblow it doesn't pay to pay someone to do my driveway."
Recommended by75%of homeowners
Showing 1-10 of 18
Deck Maintenance questions, answered by experts

Local building codes don’t specify the number of steps a deck can have before a railing is required, mainly because stair height varies widely. Most areas require decks 30 inches or higher to have a railing. While not exact, that roughly equates to four to seven steps.

Yes, you can build a deck over your outdoor HVAC unit, but you need to leave at least 5 feet of vertical clearance above the unit. If you don’t want your deck to be that high off the ground, you could build a floating deck in another part of your yard—again, as long as you leave at least 4 feet of horizontal space between the deck and your AC unit.

Yes, deck pier blocks can be used as an alternative to traditional deck footings, especially for smaller or low-to-the-ground decks. Unlike poured concrete and buried post footings, deck blocks do not require digging or pouring. However, their use is dependent on local building codes. Some areas, particularly those prone to high winds, earthquakes, or hurricanes, may not permit the use of deck pier blocks. It is essential to consult your local building codes before choosing them for your deck project.

In general, you need a footing at each corner of your deck, and within 8 feet of each other. So, how many you need depends on the size and shape of your deck, plus any local building codes. It also depends on factors like the load capacity of your soil and the weight of your deck. You can find a footing calculator online or contact a pro for support.

How long it takes to install composite decking depends on the size of the decking material, the skills of the person installing the deck, the number of people helping, and how much prep work needs to be done before you can begin. Generally speaking, it takes anywhere from a few days to several weeks to build a composite deck.

The Rothschild, WI homeowners’ guide to deck maintenance services

From average costs to expert advice, get all the answers you need to get your job done.