Top-rated subcontractors.

Get matched with top subcontractors in Auburndale, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Auburndale, WI?

Select your specific project to find the pro for you.

TRUSTED BY AUBURNDALE, WI HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon118
    Verified subcontracting services reviews

Find Subcontractors in Auburndale

Avatar for Young’s Remodeling LLC
Young’s Remodeling LLC
4.8(
72
)
Major Home Repairs (General Contractor)

Serving Auburndale, WI and surrounding areas

Approved

In business since 1993

Free estimates

Warranties offered

"Art Young Construction did an amazing job. Our front door was damaged and the frame needed to be rebuilt. Our door is not a standard door so it was not an easy job. But Art Young tackled it in a timely and efficient manner. He and his workers were professional and left no mess behind. I would highly recommend Art Young Construction."
3 Season Screened Porch
Exterior Remodel
3 Season Screened Porch
Exterior Remodel
3 Season Screened Porch

+49

Response time3 days
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Auburndale, WI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for MH Home Services LLC
MH Home Services LLC
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Auburndale, WI and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"Did the job exactly the way I wanted it to be done. There was a minor hiccup in the middle of the job that was unexpected. He checked with me first if it was ok to make the minor alteration. He was detail orenianted and he wanted the job done right. He exceeded my expectations. Very highly recommended!"
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Auburndale, WI and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 21
Subcontractors questions, answered by experts

When you think about Arts and Crafts-style homes, you probably think of a Craftsman house or a bungalow-style Craftsman. Craftsman is one of the major styles developed during the Arts and Crafts movement, but it checks most boxes. Craftsman houses have low-pitched roofs, exposed rafters, open floor plans, and stunning wood finish.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Make sure you’re getting the right size to meet your space needs, including enough space both side to side and vertically to accommodate your RV’s features and allow you to safely move it in and out of the garage. 

If you’re building an attached and enclosed garage for your RV, you’ll also want to give some thought to whether you’d like to add workspace, water or electricity, or additional storage. If so, you’ll need a garage with larger dimensions.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Auburndale, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.