Top-rated earthquake retrofitting specialists.

Get matched with top earthquake retrofitting specialists in Mica, WA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your earthquake retrofitting project in Mica, WA?

Select your specific project to find the pro for you.

Find Earthquake retrofitting specialists in Mica

Avatar for On Level Services

On Level Services

20781 W Jordan Rd
No reviews yet

On Level Services

20781 W Jordan Rd
No reviews yet
29 years of experience

Primary service is the re-leveling of Mobile Homes and the repair and refurbishing of Mobile Home foundations. Since Angies list doesn't offer this business category as an option I had to list other categories that got close.

Primary service is the re-leveling of Mobile Homes and the repair and refurbishing of Mobile Home foundations. Since Angies list doesn't offer this business category as an option I had to list other categories that got close.



5 POINT CONSTRUCTION LLC

1503 E Grassland Ct
No reviews yet

5 POINT CONSTRUCTION LLC

1503 E Grassland Ct
No reviews yet
15 years of experience

GENERAL CONTRACTOR. ALL PHASES. PREDOMINATELY RESIDENTIAL REMODEL, REPAIR, & CONSTRUCTION. PROJECT PREPARATION, ASSEMBLY & MANAGEMENT. DISASTER RESTORATION (FLOOD, FIRE, WIND, STRUCTURAL FAILURE & OBJECT COLLISION/CONTACT DESTRUCTION i.e. tree's, vehicle's, etc.)

GENERAL CONTRACTOR. ALL PHASES. PREDOMINATELY RESIDENTIAL REMODEL, REPAIR, & CONSTRUCTION. PROJECT PREPARATION, ASSEMBLY & MANAGEMENT. DISASTER RESTORATION (FLOOD, FIRE, WIND, STRUCTURAL FAILURE & OBJECT COLLISION/CONTACT DESTRUCTION i.e. tree's, vehicle's, etc.)

Earthquake Retrofitting questions, answered by experts

Ensure proper ventilation, fix leaks, and schedule regular pest inspections to protect your property.

Projects will vary based on size and scope, but an average earthquake retrofit takes between two weeks and two months. This includes the initial evaluation and plan, bidding and contract paperwork, permitting and approval process, actual work, and final inspection. Your contractor should give you a more accurate time estimate for your specific project, and they may be able to estimate how long the permitting process will take for your area.

Generally, the retrofitting process can take two to four weeks. Your contractor will let you know if staying in your home for the entire project is feasible. However, most people are able to remain at home. If your home is undergoing earthquake rehab, it's more likely that you'll need to leave until work is complete. Your earthquake insurance may cover boarding costs if your home is deemed unsafe.

Grounding is a great first step to prevent electrical shock, but you can take it further with GFCI outlets and AFCIs (arc fault circuit interrupters). In particular, AFCIs help protect against the type of electrical arcs that cause fires, like if a mouse chews on a wire or your laptop starts overheating at the wall. These are required in some areas of your home.

Many homeowners want to know whether earthquake retrofitting is tax deductible. Because it’s often considered a capital improvement, you usually can’t deduct it. In some cases and locations, you may qualify for tax incentives, but you’ll need to talk to a tax professional or the Internal Revenue Service (IRS) about your specific circumstances. You may also be able to find grant money for seismic upgrades, which can lower the cost of your insurance premiums and save money over time.

The Mica, WA homeowners’ guide to earthquake retrofitting services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"