Top-rated subcontractors.

Get matched with top subcontractors in Manti, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Manti, UT?

Select your specific project to find the pro for you.

Find Subcontractors in Manti

Avatar for DML mechanical llc
DML mechanical llc
5.0(
15
)

Serving Manti, UT and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"DML and his crew are amazing! I had a big project for them for my basement . They had to completely replace the subfloor of a large room and reinforce some of the crumbling infrastructure with a new retaining wall. They gutted, expanded, and remodeled the bathroom with new tile, sink, toilet, vent and fan, everything! I've already recommended them to two other people. Also, their prices are very reasonable."
Furnace
Commercial proyect
Home Duvan
Painting
Furnace

+75

Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Manti, UT and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Manti, UT and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Fusanya Construction
Fusanya Construction
5.0(
1
)

Serving Manti, UT and surrounding areas

In business since 2019

Free estimates

Emergency services offered

Construction and remodeling services company, housekeeping services, offices cleannig, hospital and more, b2b technology and marketplace platforms for food, shops, dealers, supermarkets and work. etc. If you need to know more please do not hesitate to contact us.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Showing 1-10 of 18
Subcontractors questions, answered by experts

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Villa exterior features often include large windows, arched doorways, patios, terraces, greenery, and gardens. Common exterior colors for villas are whites and off-whites, soft browns, and clay tones. 

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

The Manti, UT homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.