Top-rated rototilling pros.

Get matched with top rototilling pros in Manti, UT

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Manti, UT?

Select your specific project to find the pro for you.

Find Rototilling pros in Manti

Incredible Tone

No reviews yet

Incredible Tone

No reviews yet
2009 years of experience

Do you want prompt, honest, affordable and professional service for all of your to do's you don't want to do? Well you have found the right place! We do little jobs from fixing a leaking faucet, installing a new toilet to over hauling an abandoned or foreclosed home so that you can focus on what you would like to do on your to do list. We cover the entire state of Utah and will travel. Give us a call and save.

Do you want prompt, honest, affordable and professional service for all of your to do's you don't want to do? Well you have found the right place! We do little jobs from fixing a leaking faucet, installing a new toilet to over hauling an abandoned or foreclosed home so that you can focus on what you would like to do on your to do list. We cover the entire state of Utah and will travel. Give us a call and save.

Rototilling questions, answered by experts

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"