Top-rated subcontractors.

Get matched with top subcontractors in Powderly, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Powderly, TX?

Select your specific project to find the pro for you.

TRUSTED BY POWDERLY, TX HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon111
    Verified subcontracting services reviews

Find Subcontractors in Powderly

Avatar for The Basement Kings
The Basement Kings
4.8(
16
)
Major Home Repairs (General Contractor)

Serving Powderly, TX and surrounding areas

In business since 2004

Emergency services offered

Credit card accepted

"The basement king was a pleasure to work with. His knowledge is unmatched in the Texas area for sure. I received multiple quotes and talked to multiple companies and he was the best. He's passionate about his work and the manner in which it's done. If he says something, it happens. An added benefit was their cleanliness. Usually a job site of this size and complexity is a mess, but not with the basement kings. 10/10!"
Recommended by92%of homeowners
Avatar for D&D Services
D&D Services
4.7(
13
)
Major Home Repairs (General Contractor)

Serving Powderly, TX and surrounding areas

Free estimates

Credit card accepted

"They were prompt in the bid and even waited patiently for the first contractor , who was late. D&D were very professional , both Dustin and Derrick are very nice guys, I had no worries with working with them. I would definitely recommend them to anyone wanting a professional and and above and beyond job done right."
Hvac
Hvac
Insulation
Insulation
Hvac

+38

Recommended by92%of homeowners
...
Showing 1-10 of 54
Subcontractors questions, answered by experts

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

Ensures adherence to local building codes and customized designs to fit personal needs.

Drawing your own floor plans is acceptable for many kinds of projects, including interior design and room layout. You can use floor plan software to create the plans but keep in mind that the floor plan will only be as accurate as the measurements you take and enter into the software.

The Powderly, TX homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.