Top-rated excavation pros.

Get matched with top excavation pros in Nome, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Nome, TX?

Select your specific project to find the pro for you.

Find Excavation pros in Nome

Wallace enterprises
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Nome, TX and surrounding areas

Approved

Emergency services offered

Warranties offered

Small jobs welcome

I am 22 years old working full time and trying to get a business started on the side. Even though I am young I have lots of experience. I enjoy working I started painting with my family at 5 years old stuck with that for a while. Then went to another company and got more experience in a different trade. I am willing to travel my goal next year is to be near Dallas but will travel back and fourth still. If you need anything done don’t hesitate to reach out and we can meet, make a plan, agree on a price, and get it taken care of for you:) thank you for looking have a great day.

4 neighbors recently requested a quote
Amos Concrete Construction
New to Angi
Landscape - Minor Grading or Resloping

Serving Nome, TX and surrounding areas

Approved

In business since 2021

Free estimates

Offers commercial services

Here at Amos Concrete Construction, I pride myself on my professionalism, as well as my ability to complete every job to the homeowner's total satisfaction. I never leave a job unfinished, or a homeowner not 100% satisfied with my level of service. I handle outside builds in Beaumont and the surrounding areas - Call today!\n\n

Response time10 mins
Avatar for Giddens and Associates Demolition LLC
Giddens and Associates Demolition LLC
5.0(
12
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Nome, TX and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"I turned to Angie’s List to find someone to do some excavation work & leveling for an above ground swimming pool. We purchased our pool in April and reached out to at least a dozen or more companies and they were all either no shows or no response (even after providing us with a quote). It has been beyond frustrating because it was now July and no pool!! So I called Daylon with Giddens & Assoc and immediately got a response back. He came out that same day to look at our property and go over the project. He spent well over an hour discussing our plans & ideas for the project and provided us with a quote by that same evening. We we’re very impressed with him and his enthusiasm for his work so we scheduled a date and a week later he and his crew showed up and knocked it out. He’s personable, punctual, responsive, knowledgeable, and dependable. He does exactly what he says he’s going to do, period! We are very pleased with Giddens & Assoc and would definitely recommend them in the future!!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+25

Recommended by100%of homeowners
...
Showing 1-10 of 76
Excavating questions, answered by experts

To drill a shallow well, you may be able to use a drive well point. This is a tapered point that is driven into the ground. A drill bit at the end of PVC pipe may be another option to consider. A lot of the cost depends on what tools are available near you.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Consultation with the local government helps identify necessary permits, avoid project delays or legal issues, and protect project integrity.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

The Nome, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.