Top-rated rototilling pros.

Get matched with top rototilling pros in Frankston, TX

Enter your ZIP and get matched with up to 3 pros

Need a pro for your rototilling project in Frankston, TX?

Select your specific project to find the pro for you.

Find Rototilling pros in Frankston

Rototilling questions, answered by experts

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Typically 1-3 days, depending on property size and terrain condition.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.