Top-rated basement remodelers.

Get matched with top basement remodelers in Elm Mott, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Elm Mott, TX?

Select your specific project to find the pro for you.

Find Basement remodelers in Elm Mott

Avatar for Full Scale LLC
Full Scale LLC
5.0(
1
)
Basement - Remodel

Serving Elm Mott, TX and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"Nate Davis came out on time me repaired the doors in less time than his estimate,He gave me an estimate on repairing damaged siding and repairing and painting a room the work was finished under his estimate I highly recommend him for any remodeling and repairs"
Sky Shower
Sky Shower
1 neighbors recently requested a quote
First call services
New to Angi
Basement - Remodel

Serving Elm Mott, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I have been in the construction business for 20+ years. I have experience in all remodels and additions from framing,Sheetrock,painting shower builds as well as tile tub surround, walk-in showers ,backsplashes and flooring. \nShower doors installation. Interior exterior trim,millwork, cabinets,doors.\nWe will take the time and make sure you are happy and get exactly what you envisioned. Punctuality and communication is very important to us and will always work with professiolism and respect. \n

Avatar for HomeWorx Renovations
HomeWorx Renovations
New to Angi
Basement - Remodel

Serving Elm Mott, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I’m a general contractor with hands-on experience in residential renovations, repairs, and property improvements. Through my business, HomeWorx Renovations, I’ve managed projects from planning and estimating to completion, with a strong focus on quality workmanship, clear communication, and customer satisfaction. I take pride in solving problems, staying organized, and delivering projects on time while building lasting relationships with clients.

Avatar for lone star green homes
lone star green homes
New to Angi
Basement - Remodel

Serving Elm Mott, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

Our company dedicated to delivering exceptional craftsmanship, transparent communication, and outstanding customer service. With years of experience in custom home construction, renovations, and remodeling, we bring the same attention to detail to every project—whether it's a single-room remodel or a complete home transformation.\nOur expertise includes kitchen remodeling, luxury bathroom renovations, room additions, flooring, cabinetry, painting, trim work, custom millwork, and high-end finishes. We specialize in creating modern, functional spaces while maintaining the highest standards of quality and craftsmanship.\nWe believe every homeowner deserves a contractor they can trust. We provide detailed estimates, maintain open communication throughout the project, and treat every home with the same care and respect as if it were our own. Our goal is simple: deliver beautiful results, complete projects on schedule, and build lasting relationships through honesty, quality, and reliability.

...
Showing 1-10 of 84
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

Yes, barndominiums can have basements. Barndominiums are typically built over concrete slabs, so barndo basements are not very common. However, it is possible to include a basement in a barndominium blueprint as long as you’re building completely from scratch. Barndos can have the same types of basements as traditional homes, including full or walk-out basements.

The Elm Mott, TX homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.