Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Bovina, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bovina, TX?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Bovina

Avatar for Premier Entry Systems
Premier Entry Systems
4.8(
54
)
Gate for Driveway or Security - Install or Replace

Serving Bovina, TX and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"They were awesome.  I had an oddball sized garage door and they were able to locate and install a new one, add a lift motor, replace all of the channeling and add an outside entry keypad.  Now I'm able to park the cars inside once again.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for H & R Concrete Solutions
H & R Concrete Solutions
5.0(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Bovina, TX and surrounding areas

In business since 2018

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality and customer service that we provide to meet the consumers' needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. To understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety and quality, regardless of how large, or small the job.

Response time1 day
Recommended by100%of homeowners
Avatar for Precision Excavating LLC
Precision Excavating LLC
5.0(
3
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Bovina, TX and surrounding areas

In business since 2024

Free estimates

Credit card accepted

"Very professional, showed up on time scraped my alley, even went out of his way to place some field dirt in the crevices of the alley. Highly recommended for somebody who will show up and get the job done, and get the job done right"
Ropesville TX
Ropesville TX
Ropesville TX
Idalou TX
Idalou TX

+1

Response time4 hrs
Response rate88%
Recommended by100%of homeowners
Showing 1-10 of 46
Asphalt Driveways questions, answered by experts

Several materials are suitable for steep driveways. Gravel and crushed stone are affordable options that provide good traction. Permeable pavers—such as plastic, rubber, or concrete—filled with gravel or crushed stones are also excellent, as they allow water to drain without causing erosion and perform well in ice and snow. Another option is resin, which can be coated with an anti-slip finish and helps prevent puddles. For added stability, you can install a retaining wall to prevent pavers and gravel from shifting over time.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Depending on project size, typically 1 to 3 days, including preparation and installation.

The Bovina, TX homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.