"Chris was very knowledgeable about the opening of my pool as well as balancing my hot tub. He explained everything in detail so I understood what he was doing. He was friendly and professional and I would highly recommend him for your pool and hot tub needs."
"They sent someone out to come fix it. I go online when I have an issue, instead of calling. It is very easy. You go online and tell them what is broken. The respond with who will be coming out within 24 hours. They have different plans for different amounts of money. I have my house and pool covered. I pay a $75 copay a month. I have had them for several years, and have never had an issue."
Pool Construction and Installation questions, answered by experts
Construction typically takes 3-6 months, including site preparation and assembly.
Yes, new home construction will always require building permits, no matter where you live. In most cases, you’ll need a general construction permit, along with plumbing and electrical permits for the utility lines in your home. Depending on where you live, you’ll likely find that you also need permits for things like connection to a sewage system or installing exterior components, like decks, driveways, patios, and curb cutouts. Leave navigating the permits required for new home construction to a professional to ensure your home is built legally and safely.
Land surveys are worth it in several scenarios including selling your home, building an addition, constructing a fence, or making major changes to your landscape. A professional land survey can help you avoid legal issues with your neighbors and confirm the value of your property. In many cases, you may be required to order a land survey to receive a construction permit or mortgage loan.
If you can’t find any records online, you’ll need to contact your county clerk’s office to do further research. They should have property records on file, or can at least point you in the right direction of who to contact. You can also speak with your neighbors about when their houses were built because they were likely built around the same time.
The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.
The Platte, SD homeowners’ guide to pool constructions and installations
From average costs to expert advice, get all the answers you need to get your job done.
Semi-inground pools offer a nice balance of convenience and affordability. Use this guide to estimate semi-inground pool costs to transform your backyard.
Many factors affect indoor pool costs. From different types and shapes to installation and maintenance, here’s what to consider when pricing out your project.
Ready for a backyard oasis? Learn everything about above ground pool installation, including average costs, site prep, and how to hire local pool installers.