Get matched with top asphalt driveway pros in Eureka, SD
Top-rated asphalt driveway pros.

Need a pro for your asphalt driveway service project in Eureka, SD?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Eureka

Mike and Martin's Asphalt Paving and Sealcoating
4.0(
1
)

Serving Eureka, SD and surrounding areas

In business since 1976

Free estimates

We are a locally owned and operated company that values honesty, integrity and treats your home as if it were our own. We offer a variety of general contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Response time8 hrs
Response rate88%
Recommended by100%of homeowners
Avatar for Hampton Enterprise LLC
Hampton Enterprise LLC
3.7(
9
)

Serving Eureka, SD and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"I only use James when I need some work done to my house. He responds fast, gets the work done quicker than just about anyone else I've ever used and seems very concerned with leaving his customers happy."
Additional Photos
Additional Photos
Recommended by60%of homeowners
Avatar for Enhanced Basements Foundation Repair LLC
Enhanced Basements Foundation Repair LLC
New to Angi

Serving Eureka, SD and surrounding areas

In business since 2024

Free estimates

Emergency services offered

Enhanced Basements foundation repair offers reliable and affordable foundation repair solutions. Our dedicated team is committed to providing high-quality services to address various foundation issues. We take pride in our work and strive to ensure the safety and stability of your property.

American Contracting And Consulting LLC
New to Angi

Serving Eureka, SD and surrounding areas

In business since 2025

Free estimates

Offers commercial services

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.\nYou will find us to be competitively priced with close attention to the details.\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.\nWe look forward to building a lasting relationship and guarantee your satisfaction!\n

Free Scrap Metal Removers LLC
New to Angi

Serving Eureka, SD and surrounding areas

In business since 2018

Free estimates

Credit card accepted

we take great pride in our experience, expertise, quality and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety and quality, regardless of how large or small the job

Showing 1-10 of 11
Asphalt Driveways questions, answered by experts

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

By grading and compacting the base soil, ensuring proper drainage and stability.

The Eureka, SD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.