Top-rated basement remodelers.

Get matched with top basement remodelers in Colton, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Colton, SD?

Select your specific project to find the pro for you.

Find Basement remodelers in Colton

Avatar for J W Construction, LLC
J W Construction, LLC
5.0(
48
)
Basement - Remodel

Serving Colton, SD and surrounding areas

Approved

In business since 1992

Free estimates

Warranties offered

"We are so happy with our basement remodel. John was just awesome to work with - very prompt at answering our questions, knowledgeable, and his communication throughout the whole process was excellent! We could not be happier with the end result."
Rich
Rich
Rich
Rich
Rich

+11

Response time10 hrs
Response rate98%
77 neighbors recently requested a quote
Avatar for 3D Construction
3D Construction
4.6(
5
)
Basement - Remodel

Serving Colton, SD and surrounding areas

Approved

In business since 2016

Free estimates

Credit card accepted

"Overall very good experience. Quality work at a fair price. Good communication on progress of the project. Just a couple of small issues for follow-up that were completed in a timely fashion. I would recommend 3D to others."
custom shower pan and seat/shelf
custom shower pan and seat/shelf
new deck railing and pergola
new stairway from back yard down to the lake
match miters and grain pattern

+14

Response time7 hrs
Recommended by100%of homeowners
Lee Construction
5.0(
5
)
Basement - Remodel

Serving Colton, SD and surrounding areas

Approved

In business since 1979

Free estimates

Customers say: Quick response

"When I lived in Vermillion SD, John did all of my remodeling projects from 1994-2016. These included totally gutting and finishing my kitchen; finishing a basement to include a den, bedroom, bath, and laundry room; and replacing the exterior siding and trim on my 1974 house. He is an amazing carpenter/craftsman. He is easy to work with and comes up with creative solutions to problems. He comes at a moment when notice when emergencies arise and his rate is extremely reasonable. I highly recommend John for any addition or remodeling project."
Custom Cedar deck and storm room
Kitchen done back in 2004.
2016
Response time1 day
Recommended by100%of homeowners
Schwartzle Construction, LLC
3.5(
3
)
Basement - Remodel

Serving Colton, SD and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

Schwartzle Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.\n

Entrance
Living room area
Kitchen
Dinning room
Master bath

+12

Response time2 days
Recommended by100%of homeowners
Avatar for BRS Construction LLC
BRS Construction LLC
5.0(
6
)
Basement - Remodel

Serving Colton, SD and surrounding areas

In business since 1995

Free estimates

Warranties offered

"We had some trim work to finish in the basement, along with rocking the fireplace and staining doors. Brent did an excellent job from start to finish. Very professional and time oriented."
Response time1 hour
Response rate86%
Avatar for Benson Remodeling, LLC
Benson Remodeling, LLC
5.0(
3
)
Basement - Remodel

Serving Colton, SD and surrounding areas

In business since 2003

Free estimates

Credit card accepted

Welcome to Benson Remodeling, LLC, with over 15 years of experience in the home remodeling industry, I am your go-to pro for all of your home improvement needs. We take pride in the quality of work and customer satisfaction that we give each and every customer. I am known to pay exquisite attention to detail while making customer satisfaction our top priority. Call us today to learn more about how we can help you!

Tiling
After grouting
Beginning of tile process
Tile floor
Tile floor

+4

Response time7 hrs
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Colton, SD and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 46
Basement Remodel questions, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The Colton, SD homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.