Top-rated paving pros.

Get matched with top paving pros in Richland, SC

Enter your ZIP and get matched with up to 5 pros

Need a pro for your paving service project in Richland, SC?

Select your specific project to find the pro for you.

Find Paving pros in Richland

Greenville Irrigation

25 Delano Dr, Unit A
4.21(
13
)
Approved Pro

Greenville Irrigation

25 Delano Dr, Unit A
4.21(
13
)
Approved Pro
Customers say: Quick response
15 years of experience
Free onsite estimate

Here at Greensville Irrigation we take pride in our work! Customer satisfaction is the cornerstone of the way we conduct business, and strive to complete the perfect job every time. We will SHOCK you with our competitive pricing. Give us a call today for a FREE estimate!!!

"Of 3 possible, only one responded."

Dennis F on June 2015

Here at Greensville Irrigation we take pride in our work! Customer satisfaction is the cornerstone of the way we conduct business, and strive to complete the perfect job every time. We will SHOCK you with our competitive pricing. Give us a call today for a FREE estimate!!!

"Of 3 possible, only one responded."

Dennis F on June 2015


"Firepit 1ft off center Firepit had no crush under 1st layer like u promised. Actually bottom layer has zero nothing naught under it. They just laid them out around my Firepit 2 Sitting wall 5in higher rt to lt 3 Sitting wall not centered, and not 16 ft like u promised. It's closer to 12 ft 4 Water ponds in middle of pavers after rain 5 Edges of patio a mess where they dribbled cement. 6 Grass just laid on Edges of patio over dribbled quick Crete. When did grass start growing on cement, lol 7 No sand on Edges of most outside grey pavers 8 Patio lights system with the cheapest transformer $63 known to man. I could of had a 120W for the same money. $1000 was price gouging for a 10 minute install and 150 in supplies. We could have dropped a 14/2 wire under 4x3 walkway and has tons of future lighting possibilities. Thanks for looking after us. 9 U didn't even have the courtesy to walk Brenda around the patio before you dove in for the final payment. Shame on you !!!!!!!!! 10 All around patio was left a mess, especially the 3x20 section beside house 11 You damaged end of 10x3 , now 8x3 walkway and dribbled cement in crack you'll broke taking out cement. 12 You cut our live cable line and ran over it 30 to 40 times digging. You could have come in N to S and avoided running over cable so many times. 13 And above was caused when u didn't coordinate with 811 on buried cables Let Brends me know when you want to address the poor quality of your work. The only good thing is that patio is 16x20 , except for round corner he guess at the curve and just eyeballed it instead of measuring the correct arc. Very dissatisfied with the 9 000 dollar patio. Oops, forgot, we paid 5k too much for the lackadaisical job ."

Bill C on May 2024

Expert Pavers.

"Firepit 1ft off center Firepit had no crush under 1st layer like u promised. Actually bottom layer has zero nothing naught under it. They just laid them out around my Firepit 2 Sitting wall 5in higher rt to lt 3 Sitting wall not centered, and not 16 ft like u promised. It's closer to 12 ft 4 Water ponds in middle of pavers after rain 5 Edges of patio a mess where they dribbled cement. 6 Grass just laid on Edges of patio over dribbled quick Crete. When did grass start growing on cement, lol 7 No sand on Edges of most outside grey pavers 8 Patio lights system with the cheapest transformer $63 known to man. I could of had a 120W for the same money. $1000 was price gouging for a 10 minute install and 150 in supplies. We could have dropped a 14/2 wire under 4x3 walkway and has tons of future lighting possibilities. Thanks for looking after us. 9 U didn't even have the courtesy to walk Brenda around the patio before you dove in for the final payment. Shame on you !!!!!!!!! 10 All around patio was left a mess, especially the 3x20 section beside house 11 You damaged end of 10x3 , now 8x3 walkway and dribbled cement in crack you'll broke taking out cement. 12 You cut our live cable line and ran over it 30 to 40 times digging. You could have come in N to S and avoided running over cable so many times. 13 And above was caused when u didn't coordinate with 811 on buried cables Let Brends me know when you want to address the poor quality of your work. The only good thing is that patio is 16x20 , except for round corner he guess at the curve and just eyeballed it instead of measuring the correct arc. Very dissatisfied with the 9 000 dollar patio. Oops, forgot, we paid 5k too much for the lackadaisical job ."

Bill C on May 2024



Avatar for Blue Ridge Trailers and Grading

Blue Ridge Trailers and Grading

PO Box 130
No reviews yet

Blue Ridge Trailers and Grading

PO Box 130
No reviews yet
4 years of experience

At Blue Ridge Trailers and Grading, we’re more than just an excavation company — we’re your trusted partner in land development. With years of experience, we specialize in a full range of services to help you bring your vision to life. From grading and landscaping to land clearing, hardscaping, and excavation, we guarantee exceptional quality and complete satisfaction every time. Why Choose Us? Expert Grading & Landscaping for flawless results Land Clearing & Excavation to prepare your space for any project Custom Hardscaping & Rock Retaining Walls to enhance your property’s beauty and functionality And Much More! Our team is committed to delivering top-tier work and providing unmatched customer service. We don’t leave until the job is done right — the first time. Ready to get started? Call today or click to schedule your free estimate!

At Blue Ridge Trailers and Grading, we’re more than just an excavation company — we’re your trusted partner in land development. With years of experience, we specialize in a full range of services to help you bring your vision to life. From grading and landscaping to land clearing, hardscaping, and excavation, we guarantee exceptional quality and complete satisfaction every time. Why Choose Us? Expert Grading & Landscaping for flawless results Land Clearing & Excavation to prepare your space for any project Custom Hardscaping & Rock Retaining Walls to enhance your property’s beauty and functionality And Much More! Our team is committed to delivering top-tier work and providing unmatched customer service. We don’t leave until the job is done right — the first time. Ready to get started? Call today or click to schedule your free estimate!


Avatar for E&E Landscaping Services

E&E Landscaping Services

415 Laurel Grove Ct
4.43(
7
)

E&E Landscaping Services

415 Laurel Grove Ct
4.43(
7
)
Customers say: Terrific value
9 years of experience

At E&E Landscaping Services we only provide the highest quality work available! We only use the best quality materials! We specialize in; Mulch, Sod, Pine Straw, Dry Creek Beds/ Drainage, and much more! We offer FREE quotes and will give discounts on bulk materials! Let E&E Landscaping Services get your property looking BEAUTIFUL again!

"Be careful"

Bob N on April 2023

At E&E Landscaping Services we only provide the highest quality work available! We only use the best quality materials! We specialize in; Mulch, Sod, Pine Straw, Dry Creek Beds/ Drainage, and much more! We offer FREE quotes and will give discounts on bulk materials! Let E&E Landscaping Services get your property looking BEAUTIFUL again!

"Be careful"

Bob N on April 2023


Avatar for Over The Moon Construction LLC

Over The Moon Construction LLC

145 Duncan Rd
4.00(
6
)

Over The Moon Construction LLC

145 Duncan Rd
4.00(
6
)
Free onsite estimate

I enjoy the challenge of creatively finding solutions to best suit my clients needs without breaking the bank. Over the years I have been able to build great customer relation by being honest, reliable, having great communication, and taking plenty of pictures on the way to show my clients the progress in their project. I take great pride in my client satisfaction and my own workmanship.

"We expected the house would be professionally updated with beautiful trims, colors, flooring, more spacious bathrooms, and most important – an extraordinary construction design with ADA accessible walk-in shower with convenient and safe accommodations for my mother and that the project would be completed by Thanksgiving 2021 for family gathering. I walked through early December and discovered that the house was filled with construction dust thickly floating in the air and covering all furniture, clothes, fixtures, vents, floors, etc. This was devastating as I’ve never seen anything like that - the house was unrecognizable and it was difficult to even see the new construction details as he nonchalantly continued to sand away at sheetrock, new trim, etc. his tools added even more dust everywhere.! I knew at that point it was going to be challenging to get in the house by Christmas. I hired flooring and painting contractors because he was extremely behind – working alone and could not add the floor and paint too. December – I hired a separate contractor to install hardwood flooring for bedrooms and painter because Wes seemed overwhelmed at this point alone and no resources to get us in the house temporarily for New Years and stay in guest bedroom as master wing was still in trim frame. Floor contractor delayed several times until construction saw tools and other equipment were removed and room cleared to allow him in. eventually able to do guest bedrooms but had to wait until late Feb/ early March for equipment to be moved to complete. Contractor requested painting before flooring but the house was filled with floating dust throughout and still he demanded that he sand more of the bead board, trim and walls. The painter that I paid was yelled at daily by Wes who demanded he return three times re- sand and repaint at my expense. However, the problem was trim that wasn’t professionally squared, uneven in spots, and walls that now showed many imperfections from constant sanding. Contractor’s solution initially for shower was to build floor up from entry to bathroom for roll-in shower. Immediately when I walked it I realized it would be a safety issue for my mother who has severe scoliosis. Paid Wes to remove flooring and do an alternative idea. He suggested building shower with 4” lip. Though it wasn’t what we expected or wanted, it was presented as the only option and seemed to that it might work as I understood stepping over lip into shower. Framing seemed that way. When I walked through the completed shower, I discovered that it was a step UP shower. That was an even worse solution for an elderly disabled person. Also, tiles and grouting not straight or even, also same for main bathroom floor tiling. Insisted that it be changed. Additionally, custom shower door had been ordered based on the size the shower was built @ $1700 cost. When I complained and requested replacement of poor-quality trim, he offered to cut pieces to fill gaps and uneven corners and find tile trim to cover rough uneven shower tile edges. He even said that he may replace a few tiles, but I didn’t want patching because I paid high dollar for professional work and materials. Also, I realized that the entire shower and floors would have to be torn out as it didn’t make sense to tear out a few tiles when it included floor and walls that were messed up. I found Freedom Shower Redi Tile roll-in shower solution. More expensive but Wes was not in agreement to pay anything. All expenses were going to lay on me. We now have a shower that my mother cannot use with uneven tiles in master and hallway bathrooms. DISSATISFACTION / HAZARDOUS CONCERNS:  ADA master bathroom shower construction and design are unsatisfactory for my mother’s ADA needs and did not meet her needs  Hazardous construction dust lingered throughout construction in entire house, ductwork, air, clothing, furniture, ceilings due to negligence of not protecting / covering these areas which required professional cleaners in December and May. Even newly purchased toilets were used and left unclean.  Poor quality installation of shower and floor tiles with crooked, uneven, and poorly fit tiles, along with uneven grout did not meet professional quality expectations in master and main bathroom floors  Construction of shower installation and design unsafe for disabled customer  Walls and trim work show imperfections from excessive sanding, making new construction look less professional than before construction was done  Barndoors left unfinished as well as downstair doors do not properly close/open  Excessive damage to hardwood and marble tile due to negligence – repair pending.  Dissatisfied with the labor rates for project that started at October for three bathrooms expansions with only one total demo still aren’t completed. Time extended to almost 6 months until I stopped to get house cleaned and cost is now $77k to contractor and additional $24K for our costs – minus cleaning/repair costs."

San D on June 2022

I enjoy the challenge of creatively finding solutions to best suit my clients needs without breaking the bank. Over the years I have been able to build great customer relation by being honest, reliable, having great communication, and taking plenty of pictures on the way to show my clients the progress in their project. I take great pride in my client satisfaction and my own workmanship.

"We expected the house would be professionally updated with beautiful trims, colors, flooring, more spacious bathrooms, and most important – an extraordinary construction design with ADA accessible walk-in shower with convenient and safe accommodations for my mother and that the project would be completed by Thanksgiving 2021 for family gathering. I walked through early December and discovered that the house was filled with construction dust thickly floating in the air and covering all furniture, clothes, fixtures, vents, floors, etc. This was devastating as I’ve never seen anything like that - the house was unrecognizable and it was difficult to even see the new construction details as he nonchalantly continued to sand away at sheetrock, new trim, etc. his tools added even more dust everywhere.! I knew at that point it was going to be challenging to get in the house by Christmas. I hired flooring and painting contractors because he was extremely behind – working alone and could not add the floor and paint too. December – I hired a separate contractor to install hardwood flooring for bedrooms and painter because Wes seemed overwhelmed at this point alone and no resources to get us in the house temporarily for New Years and stay in guest bedroom as master wing was still in trim frame. Floor contractor delayed several times until construction saw tools and other equipment were removed and room cleared to allow him in. eventually able to do guest bedrooms but had to wait until late Feb/ early March for equipment to be moved to complete. Contractor requested painting before flooring but the house was filled with floating dust throughout and still he demanded that he sand more of the bead board, trim and walls. The painter that I paid was yelled at daily by Wes who demanded he return three times re- sand and repaint at my expense. However, the problem was trim that wasn’t professionally squared, uneven in spots, and walls that now showed many imperfections from constant sanding. Contractor’s solution initially for shower was to build floor up from entry to bathroom for roll-in shower. Immediately when I walked it I realized it would be a safety issue for my mother who has severe scoliosis. Paid Wes to remove flooring and do an alternative idea. He suggested building shower with 4” lip. Though it wasn’t what we expected or wanted, it was presented as the only option and seemed to that it might work as I understood stepping over lip into shower. Framing seemed that way. When I walked through the completed shower, I discovered that it was a step UP shower. That was an even worse solution for an elderly disabled person. Also, tiles and grouting not straight or even, also same for main bathroom floor tiling. Insisted that it be changed. Additionally, custom shower door had been ordered based on the size the shower was built @ $1700 cost. When I complained and requested replacement of poor-quality trim, he offered to cut pieces to fill gaps and uneven corners and find tile trim to cover rough uneven shower tile edges. He even said that he may replace a few tiles, but I didn’t want patching because I paid high dollar for professional work and materials. Also, I realized that the entire shower and floors would have to be torn out as it didn’t make sense to tear out a few tiles when it included floor and walls that were messed up. I found Freedom Shower Redi Tile roll-in shower solution. More expensive but Wes was not in agreement to pay anything. All expenses were going to lay on me. We now have a shower that my mother cannot use with uneven tiles in master and hallway bathrooms. DISSATISFACTION / HAZARDOUS CONCERNS:  ADA master bathroom shower construction and design are unsatisfactory for my mother’s ADA needs and did not meet her needs  Hazardous construction dust lingered throughout construction in entire house, ductwork, air, clothing, furniture, ceilings due to negligence of not protecting / covering these areas which required professional cleaners in December and May. Even newly purchased toilets were used and left unclean.  Poor quality installation of shower and floor tiles with crooked, uneven, and poorly fit tiles, along with uneven grout did not meet professional quality expectations in master and main bathroom floors  Construction of shower installation and design unsafe for disabled customer  Walls and trim work show imperfections from excessive sanding, making new construction look less professional than before construction was done  Barndoors left unfinished as well as downstair doors do not properly close/open  Excessive damage to hardwood and marble tile due to negligence – repair pending.  Dissatisfied with the labor rates for project that started at October for three bathrooms expansions with only one total demo still aren’t completed. Time extended to almost 6 months until I stopped to get house cleaned and cost is now $77k to contractor and additional $24K for our costs – minus cleaning/repair costs."

San D on June 2022


J's Tree Service & Landscaping

2984 Flat Creek Valley Rd
No reviews yet

J's Tree Service & Landscaping

2984 Flat Creek Valley Rd
No reviews yet
11 years of experience

Here at J's Tree Service we can take care of all your tree and landscaping needs. Anything from tree removal to just trimming or building new flower beds to rock work. We have been in business for over 5 years now and we have not left the job were the customers have not been satisfied with our work. Give us a call it would be our pleasure to work for you!

Here at J's Tree Service we can take care of all your tree and landscaping needs. Anything from tree removal to just trimming or building new flower beds to rock work. We have been in business for over 5 years now and we have not left the job were the customers have not been satisfied with our work. Give us a call it would be our pleasure to work for you!




Showing 1-10 of 27
Paving Services questions, answered by experts

While it may be less expensive initially to lay concrete vs. pavers, the long-term expenses that come with repairing concrete may prove to be less cost-friendly than simply replacing a few damaged pavers. On top of that, stamped concrete may only last for 25 years compared to pavers, which can last over 50 years.

If your new pavers look dull, it’s usually because of efflorescence. It is a chalky, white powder that is released when lime gets wet. If you have the patience, simply wait a year or so out. Efflorescence will be washed away naturally by rain. You can also use a pressure washer to restore faded pavers covered by efflorescence.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Gravel driveways last the longest. With proper installation and routine maintenance, they can last upwards of 100 years. To make sure they last as long as possible, gravel driveways should be properly graded and leveled during installation and repair. The natural material is extremely durable, but the grooves make it challenging to remove snow and easy for weeds to grow through the cracks. Still, this is nothing an afternoon DIY project can’t fix and lends to the fact that their easy maintenance helps gravel driveways last even longer.

Compared to a 10x20 concrete driveway costing between $800 and $3,000, a resin bound driveway of the same size costing $3,900 to $4,000 is the more expensive option. However, the cost still makes resin a cheaper option compared to a 10x20 paver driveway costing an average of $12,000.

The Richland, SC homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"