"I highly recommend Pellicore Concrete! My wife and I hired Pellicore to remove our 10' wide asphalt driveway and replace it with a widened 18' concrete driveway. The project also entailed demolition of our existing concrete porch, replacing it, adding a new front patio, and tying the porch and patio work into the new driveway. Joe Pellicore met with us and gave us estimates for the entire project, along with breaking down the project into its component parts with estimates for each. We went with the entire project. Joe worked with us on dates for the project, which ended up taking 4 days. Joe and his staff arrived on time every day and kept us informed through each step, making sure we were involved in final decisions. Once the project was poured the crew did an amazing job cleaning up and backfilling gaps between the lawn and the new porch and driveway. They did fantastic work! We love our new porch, patio, and driveway!"
"The project was scheduled quickly and complete it in one day. Rich Immediately respond when I questioned the seeding procedure. The task was completed in a professional and timely manner. Thank you Home Advisor for the Rich s Landscaping Referral."
"These guys were great. We loved the work they did. They edged the grass back and blew off the driveway before they filled in the cracks. They put down the rubber edge before they hand squeegee the seal coat. And taped off the sidewalks and driveway. We definitely would hire these guys again! Thank you Omni!"
"Everyone at Evergreen LMI really stood out for making the drainage project at our house so easy and for doing such a great job. Suzanne made the proposal and project set up very easy. And even though it was really hot the day of installation, Keith and his team worked straight through, and the quality of the work - - the way they matched the PVC pipe to the bottoms of the downspouts; the way they laid the lines and replaced and smoothed the sod sections, and then watered - - was first rate! I would recommend Evergreen Landscaping to anyone."
"They did a beautiful job on the brickwork finishing an existing patio. Their work was meticulous! We are very pleased with it and have plans on hiring them for another project."
The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.
If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:
Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs.
Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.
Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.
To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.
New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.
While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.
The Wycombe, PA homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Use our guide to calculate the cost to seal an asphalt driveway in Philadelphia, PA. Prices vary based on the type of sealant and the size of the driveway.
Find out the average concrete driveway repair cost in Philadelphia, PA. Learn what you can expect to pay for local concrete repair services and fix your slab.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.