Top-rated basement remodelers.

Get matched with top basement remodelers in Mifflin, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Mifflin, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Mifflin

Avatar for Millstone Co
Millstone Co
2.3(
3
)
Basement - Remodel

Serving Mifflin, PA and surrounding areas

Approved

Free estimates

Credit card accepted

"Matt and Laura at Millstone had great ideas for my renovation. Their team did excellent work and did it all with professionalism and courtesy. I will definitely call Millstone for my next project."
27 neighbors recently requested a quote
Avatar for Brand New Basement
Brand New Basement
5.0(
2
)
Basement - Remodel

Serving Mifflin, PA and surrounding areas

In business since 2020

Free estimates

Credit card accepted

We have 15+ years of experience. A wet basement is terrible for your health and the health of your home. Today’s technology makes it easier than ever to turn a problem area into a prosperous area. It doesn’t have to cost an arm and a leg. I’m a contractor who will do the same job for a lot less than the other guys. Save a ton of money on your Brand New Basement.

Additional Photos
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Mifflin, PA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 28
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Mifflin, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.