Top-rated rototilling pros.

Get matched with top rototilling pros in Meeker, OK

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Meeker, OK?

Select your specific project to find the pro for you.

Find Rototilling pros in Meeker

Vinson's Trenching LLC is a third generation family owned business. We have been in business for 40 years. We are based out of Meeker, OK but we sereve customers from Meeker, Shawnee, Harrah, McLoud, Oklahoma City, Edmond and the surrounding areas.


Rototilling questions, answered by experts

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Many ways to landscape a steep slope on a budget exist. Avoiding expensive retaining wall construction is the first step. Consider creating a rocky slope with boulders or large stones, or think about planting perennials that return every year with a single investment. Transplanting small trees from elsewhere on your property is also possible and can help to stabilize steep slopes without purchasing new ones. 

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

DIY landscaping is possible, but professional services offer expertise in selecting appropriate plants and designing functional spaces that complement the natural environment and adhere to local regulations.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.