Top-rated rototilling pros.

Get matched with top rototilling pros in Urbana, OH

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Urbana, OH?

Select your specific project to find the pro for you.

Find Rototilling pros in Urbana



All Service Handyman LLC

No reviews yet

All Service Handyman LLC

No reviews yet
16 years of experience

We have three employees and if needed three sub-contractors. We can take check and cash only for payment of work. Payment is due in full at completion of the job. All jobs consisting of multiple days to complete will require a 1/3 down payment with balance due at the end of the job. We are a fully insured company and have been with the same insurance company for over 12 years. We offer free estimates. We have references available upon request.

We have three employees and if needed three sub-contractors. We can take check and cash only for payment of work. Payment is due in full at completion of the job. All jobs consisting of multiple days to complete will require a 1/3 down payment with balance due at the end of the job. We are a fully insured company and have been with the same insurance company for over 12 years. We offer free estimates. We have references available upon request.



Rototilling questions, answered by experts

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

The average cost to have rototilling done on your property is around $250, and most homeowners pay between $100 and $350. The total for your rototilling project will depend on the area you need tilled, the quality of the soil, how many roots and shrubs are in the area, and the accessibility of the area. Anything that increases the time to till your soil—like hard clay soil, small entrances to the area that require the use of smaller tools, and roots running through the ground—will all increase your costs.

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

Water pooling, uneven surfaces, or basement leaks are indicators.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.