Top-rated mulch and topsoil pros.

Get matched with top mulch and topsoil pros in Powhatan Point, OH

There are 0 highly-rated local mulch and topsoil pros.

Need a pro for your mulch and topsoil service project in Powhatan Point, OH?

Select your specific project to find the pro for you.

Find Mulch and topsoil pros in Powhatan Point




JJV Rubber Mulch and Safe Rock LLC

98 W Arion Street
No reviews yet

JJV Rubber Mulch and Safe Rock LLC

98 W Arion Street
No reviews yet
21 years of experience

JJV Rubber Mulch and Safe Rock, stands poised and proud by providing rubber mulch products that utilizes NON-TIRE recycled rubber in the production process. JJV Rubber Mulch continues to offer a safe and clean alternative.

JJV Rubber Mulch and Safe Rock, stands poised and proud by providing rubber mulch products that utilizes NON-TIRE recycled rubber in the production process. JJV Rubber Mulch continues to offer a safe and clean alternative.

Mulch and Topsoil questions, answered by experts

A yard of crushed concrete costs between $20 and $50. A single-car driveway will need 1.5 to 2.5 yards of crushed concrete, putting your material costs between $30 and $125, which is much less than you’ll pay for most driveway paving methods. Your total could vary based on the thickness you’re going for, and, of course, total prices will increase with added square footage for driveways that fit multiple cars.

Mid to late spring is the best time of year to mulch. If you do it too early in the spring, the mulch could slow down the warming process of the soil and affect how well plants grow. By mid to late spring the temperatures are usually steadying, making it an ideal time to spread mulch.

There should be a 1-inch thick layer of sand underneath your pavers in order to provide a proper base.

The time that it takes to fill in a pool with dirt varies based on the size of the pool and the equipment you have available. Using heavy equipment, like an excavator rather than a shovel, will significantly cut down on the time it takes to complete the project. With the right equipment, it may only take a day or two. However, after the initial filling, the dirt will continue to settle over the following weeks and months. You may need to add more dirt to make the empty area level with the rest of the yard.

A 50-pound bag of pea gravel equals approximately one-half of a cubic foot. That amount will cover a three-square-foot area to a depth of about two inches. A three-square-foot area with equal-length sides is approximately 1.73 feet by 1.73 feet, or about 20.75 inches on each side.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The Powhatan Point, OH homeowners’ guide to mulch and topsoil services

From average costs to expert advice, get all the answers you need to get your job done.