Top-rated rototilling pros.

Get matched with top rototilling pros in East Palestine, OH

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in East Palestine, OH?

Select your specific project to find the pro for you.

Find Rototilling pros in East Palestine

Roby's construction

No reviews yet

Roby's construction

No reviews yet
Free onsite estimate

We can are a sub contacting company

We can are a sub contacting company


Ianazone's Contracting

No reviews yet

Ianazone's Contracting

No reviews yet
17 years of experience

We're a smaller company with great potential, we are here only for the customers needs, our request for payment is material cost upon agreement of job. The remaining amount is to be paid in full on the last day of the job, before the end of our work day. If the job is not complete up to the standards of the original estimate, the payment can be halted for no longer than 48hrs, or until the job is finished and complete to the estimates original plans.

We're a smaller company with great potential, we are here only for the customers needs, our request for payment is material cost upon agreement of job. The remaining amount is to be paid in full on the last day of the job, before the end of our work day. If the job is not complete up to the standards of the original estimate, the payment can be halted for no longer than 48hrs, or until the job is finished and complete to the estimates original plans.


Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Improved drainage, garden aesthetics, and protection from moisture damage.

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.