Top-rated basement remodelers.

Best basement remodelers near Aberdeen, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Aberdeen, OH?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Aberdeen - Updated Nov 2026

Remember Remodeling
New to Angi
Basement - Remodel

Serving Aberdeen, OH and surrounding areas

Approved

In business since 2018

Free estimates

We are a locally owned and operated company that values honesty, integrity, and treats your home as if it were our own. We offer a variety of general contractor home improvement services that are customizable to each individual project. We specialize in remodels, but also offer a wide range of expertise for a variety of other projects. We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction!

Response time4 days
Glory Construction Group
New to Angi
Basement - Remodel

Serving Aberdeen, OH and surrounding areas

Approved

Free estimates

Credit card accepted

Glory Construction Group is a trusted general contractor with 25+ years of experience delivering reliable, high-quality construction services for residential and commercial projects.\n\nWe specialize in new construction, renovations, and full project management—completed on time, on budget, and built to last.\n\nKnown for our professionalism, skilled craftsmanship, and strong client relationships, we take pride in getting the job done right the first time.\n\nLet’s build something great. Contact Glory Construction Group today.

Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Basement - Remodel

Serving Aberdeen, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Upon discovering water leaking into my basement i contacted buckeye waterproofing. Jerry Schieve, field supervisor came out and gave an estimate and scheduled the work.. Within 2 weeks the crew was at my home working. IT took 3 days to complete and everything went well.
"
Recommended by76%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Aberdeen, OH and surrounding areas

In business since 2006

Credit card accepted

"It was fine. The original design didn’t meet my needs based on the information I provided them. However, they revised the plans which worked out better for me. They were able to get the first draft to me pretty quickly."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 55
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The Aberdeen, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.