Top-rated basement remodelers.

Get matched with top basement remodelers in Otego, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Otego, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Otego

Avatar for Tek Construction
Tek Construction
5.0(
1
)
Basement - Remodel

Serving Otego, NY and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"TEK Construction was the perfect solution to our problem. Painting 80% of the interior of my 100 plus year-old house. Kyle did a professional job prepping, repairing and painting several different surfaces. He made old surfaces look new. He was meticulous and professional, covering furniture and floors as necessary to not leave any signs of the painting on carpets, floors, furniture or cabinets. On the job when he said he would be and left the areas orderly and clean at the end of each day. I will be using them for future projects and would recommend them to others in the future."
Avatar for High Tech Construction Co
High Tech Construction Co
4.3(
43
)
Basement - Remodel

Serving Otego, NY and surrounding areas

In business since 1987

Free estimates

Emergency services offered

"Very well!  The work was done quickly, professionally, and great clean up after the job was completed, we are very pleased with the results and would recommend High Tech and definitely use them again
"
Facade Restoration - High Tech Construction Co
stoop restoration -high tech construction co
Wood Stoop
Limestone Stoop
brownstone stoop and facade restoration

+20

Recommended by81%of homeowners
Avatar for J's Construction
J's Construction
4.5(
17
)
Basement - Remodel

Serving Otego, NY and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"Jeorge is easy to work with. He is a straight shooter and keeps you informed. He even shored up some gutters as he was replacing the soffits. The work went smoothly in spite of several periods of rain. The quality of the work is very good. He and his helper worked quietly - no music or cursing. I would definitely consider him for any other construction related work."
Recommended by93%of homeowners
Avatar for Johnson Roofing and Siding
Johnson Roofing and Siding
4.3(
39
)
Basement - Remodel

Serving Otego, NY and surrounding areas

In business since 1969

Free estimates

Warranties offered

"We are 100% satisfied customers. Lynn was prompt, quick and positive to work with. He is experienced and reliable. We would reccommend him to anyone needing his expertise in roofing and repairs."
 Before
 Interior Painting
 After
 Interior Painting
  After

+9

Response time2 days
Response rate94%
Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Otego, NY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 51
Basement Remodel questions, answered by experts

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The average cost of remodeling a basement is $30 to $75 per square foot. If your space is unfinished and looks like it may need more help, use the higher number when calculating your estimated basement remodeling costs. A good rule of thumb is to add an additional 20% to the top of your estimate to cover any “what if” situations.

The Otego, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.