Top-rated basement remodelers.

Best basement remodelers near Battle Mountain, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Battle Mountain, NV?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Battle Mountain - Updated Nov 2026

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Battle Mountain, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Basement Remodel FAQs, answered by experts

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.