"They arrived on time. Worked efficiently without stopping until the job was done. We replaced our tub with a shower unit. Itâ s gorgeous! They did an amazing job."
"I had my roof replaced. The salesperson was knowledgeable and very personable. Bridget was amazing. Communication was great throughout the entire process and I was satisfied with the results."
"This is a top notch company. Everyone we dealt with was very professional and flexible. We wanted to replace our old 2nd floor master bathroom with a modern walk-in shower, Toto Neorest, new vanity, lighting, electrical upgrade, flooring and new paint. They handled all required permits and inspections. They coordinated with other vendors whose products we purchased. We were impressed with the professionalism of all the workers. We always felt informed and confident in their work. They cleaned up before leaving each day. The finished work was breathtaking."
"So far, just completed the sales call. Very professional, no hard sell tactics. Got exactly what we wanted. Hopefully, the rest of the process will go as smoothly."
"Andrew knocked this install out of the park! He replaced an incredibly inefficient hot water heater with a hybrid hot water heater, ran the condensate line through pipe straps screwed into drop in anchors along our basement wall with the cleanest looking final result that surpassed every expectation I had. He was very communicative well within the budget and will be our go to for any future work we need as long as we live in this area!"
"We had an excellent experience with the whole team at PIC. Wonderful job on our shower and windows replacement. The communication with everyone was great and the installation was professional."
"Replaced a bow window and a patio slider. They accomplished it all in one day. They were clean, covered everything up when they were working so there was minimal dust. Vacuumed when they finished. Pleasant and professional. I highly recommend Rite Window."
"This was for a shower that I was replacing, a cheap leaky set-up for a new tile shower, and my father and I did most of the work. We just needed someone for labor to Tile grout work. They were very professional and worked with us based on the work we already did. Highly recommend them"
If you don’t caulk your bathtub, then there won’t be a watertight seal between your bathtub and the wall tile surrounding it. As a result, water can seep into the wall and the floor and cause the perfect breeding grounds for mold and mildew. Not only does this require costly repairs, but mold can be harmful to those breathing it.
A professional bathtub installation or replacement typically takes one to three days, depending on the project's complexity and any necessary alterations. If you hire a professional, most replacements can be completed in one to three days. However, if you choose the DIY route, the process could take up to a month, as it involves removing the old tub and drywall, installing the new tub, repairing the drywall, and installing new tiling.
The most common type of tub is the alcove; most bathtubs are shower and tub combinations. Many suburban homes feature these as the default option because they allow the flexibility for users to take a bath or a shower—a notable benefit for those with pets and young kids.
You can put a structure under your bathtub for support. Many modern tubs come with a built-in support structure underneath. Almost any type of mortar or floor-leveling compound is acceptable for new bathtubs that don’t include a support structure.
You can also install spray foam under an existing bathtub to eliminate or reduce squeaking or sagging. However, spray foam isn’t rigid enough for primary tub support.
Labor is the most expensive part of a bathroom remodel. If you’re doing a major remodel, structural changes (such as moving walls) and plumbing reconfiguration can be costly. For a standard remodel, the big-ticket items include tiles and new tub or shower fixtures.
The Greenfield, NH homeowners’ guide to bathtub replacements
From average costs to expert advice, get all the answers you need to get your job done.
We’ll cover the cost of replacing a shower or bathtub drain, whether you can tackle this repair yourself, and what other projects to consider along the way.