We provide residential and commercial solar power options, and provide support services for industry partner companies. We offer no cost consultations and $0 down financing. Please contact our office for a consultation at (931)922-8258.
"The Tech came out and due to the parts shortage he was not able to replace the front panel so Choice warranty gave me a voucher to replace it. I'm very pleased with their services. All I paid was the service fee."
"The last was a rental company that we have and we used them for an air conditioning and heating system. It was Bototach Mechanical. It’s been a good program for us. They’re very responsive. I don’t know what the thought process was. My husband said, well let’s try these guys and so we did. We have an older home and it’s proved to be a very good deal. The quality has been pretty good, so I would give them an A for the quality. I will give you one helpful hint though. If the company decides they want to replace an appliance, you need to call them and negotiate with them because you can upgrade, but you need to talk to them in person not just do it over the internet."
While solar panels can be a great investment, they aren’t ideal for every roof. For example, some roofs, especially older or structurally weak ones, may struggle to support the added weight, leading to potential damage. Roofs with complex designs, obstructions, or limited sunlight exposure might not provide optimal conditions for solar energy production. Consider these downsides when determining if solar panel installation costs are worth it.
The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.
However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.
Yes, solar panel installation will require permits. The required permits will depend on where you live, as some states and cities have solar-specific permits, while others only require electrical permits to connect to the grid. In either case, it’s best to hire a reputable solar installer in your area, as a representative should handle all of the necessary permitting for you and will include the cost of the permits in your initial solar estimate.
Homeowners replace their solar panels after 25 years. That said, you don’t necessarily need to replace them at the 25-year mark. You’ll notice a declining ability to produce electricity over time. Most homeowners spring for a replacement when they notice their energy bills creeping up to regular levels or when solar panel repairs are extensive, frequent, and no longer economical.
You shouldn’t hook up a solar panel directly to a battery. That can damage the solar battery and your appliances over time. Instead, install a charge controller between your solar panel and solar battery. Charge controllers regulate voltage, prevent overcharging, and minimize the amount of electrical current to protect your battery from voltage spikes.
The Callaway, NE homeowners’ guide to solar panel services
From average costs to expert advice, get all the answers you need to get your job done.
Find out how much it costs to remove solar panels, including average prices, key cost factors, and tips to save money on your solar panel removal project.
There are a few factors to consider when it comes to solar panel repair costs. This guide breaks down the prices of solar panel removal, repair, and replacement.
There are three types of solar panels: monocrystalline, polycrystalline, and thin-film. Before choosing one for your home, here are the pros and cons of each.
If you’re making the switch to solar energy, you’ll want to know the difference between solar panels versus solar shingles. Here are the pros and cons of each.