Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Bloom, ND

Enter your ZIP and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bloom, ND?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Bloom

Avatar for Warmzone

Warmzone

4.00(
3
)

Warmzone

4.00(
3
)
Customers say: Quick response
22 years of experience

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

Asphalt Driveways questions, answered by experts

The main difference between asphalt and blacktop is that asphalt has a lower ratio of bitumen—a low-grade tar-like crude oil—than blacktop. While blacktop is heated to 300 degrees or more, hot-mix asphalt is heated to a lower temperature, typically between 275 and 300 degrees Fahrenheit. Consult an asphalt driveway professional about which type of material is the best fit for your future asphalt driveway.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

DIY is not recommended due to equipment and expertise requirements. Professional services ensure durability and proper grading.

Since it has a smoother surface using a mixture of finer rock and sand, 41A tends to be the best asphalt grade for a driveway, especially for residential driveways. Other options are available, but more homeowners choose 41A for a smoother asphalt driveway. Talk with your asphalt driveway professional for recommendations of the best grade for your specific driveway.

Yes, asphalt is less expensive than concrete. Asphalt prices range between $7 and $15 per square foot, whereas concrete costs $3 to $18 per square foot. When considering asphalt versus concrete driveways, you’ll want to weigh more than just the costs. While concrete costs more, it costs less to maintain. On the other hand, asphalt has the advantages of a quick installation and shorter drying time.

The Bloom, ND homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"