Top-rated rototilling pros.

Get matched with top rototilling pros in Hertford, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Hertford, NC?

Select your specific project to find the pro for you.

Find Rototilling pros in Hertford

Boyco Landscaping

No reviews yet

Boyco Landscaping

No reviews yet

We specialize in landscape/hardscape design and installation, as well as commercial, multifamily, and HOA landscape maintenance throughout the state of North Carolina. We have been in business for over 30 years, originating as Boyco West Co. of Greensboro, NC in 1984, and we are a licensed North Carolina landscape and irrigation contractor.

We specialize in landscape/hardscape design and installation, as well as commercial, multifamily, and HOA landscape maintenance throughout the state of North Carolina. We have been in business for over 30 years, originating as Boyco West Co. of Greensboro, NC in 1984, and we are a licensed North Carolina landscape and irrigation contractor.


Reliable Solution Contractors, LLC offers a wide variety of services to the North Carolina and Virginia areas

Rototilling questions, answered by experts

Yard grading is a key component of proper drainage because runoff naturally moves with respect to gravity. If you have low spots in your yard, rain and snowmelt will settle there and oversaturate the soil, promoting root rot and fungal growth. If the low spots are near your home’s foundation, you could even end up with foundation leaks or structural damage due to poor yard grading.

The largest issue with xeriscaping is the up front cost and the amount of work required to amend your old lawn. Xeriscaping costs $3,000 to $24,000 on average, but the long-term payoff, both financially and environmentally, includes saving water, time, and money on lawn maintenance.

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

You should exercise care when deciding how to landscape over a leach field for your septic system. You typically want lightweight materials that won’t damage the drain field’s perforated pipes. When adding plants to the area, select plants with shallow roots, such as grass or flower gardens. Trees with deep roots could damage the pipes in the field.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.