Top-rated pole barn builders.

Get matched with top pole barn builders in Flat Rock, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Flat Rock, NC?

Select your specific project to find the pro for you.

TRUSTED BY FLAT ROCK, NC HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon65
    Verified pole barn building services reviews

Find Pole barn builders in Flat Rock

Avatar for DDK Construction LLC
DDK Construction LLC
4.9(
27
)
Shed, Barn or Playhouse - Build

Serving Flat Rock, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2004

Free estimates

Emergency services offered

"The area below the deck was covered with an oily, greasy, slippery residue ie, flagstone patio, stucco house walls, stone support pillars for deck, and numerous potted and bedding plants. Even the doormat was greasy. It had been explained to me that there would be a waiting period of 3 wks between the power wash of the joists and the spraying of the sealant. After the power wash I texted to remind the contractor for the stone area and plants to be covered, but did not know that the sealant would be applied the very next day to wet wood…and without any protective covering to the patio, pillars, house, and plants. Windows thankfully were covered. I slipped on the greasy doormat when I discovered the problem the next morning. I was not at home the day of the spraying. The cans left in the driveway said not to spray on wet wood, to protect areas/plants/objects not being sprayed, and remove immediately any overspray with compliant cleaner. I made the first payment for materials at Lowe’s ($3182.99) in July. The second payment was for posts and 2x4 wood ($1800-no receipt given) combined together with $7000 requested by contractor unexpectedly one Friday afternoon. He usually just dropped by- no appts or advance notice. Contractor left immediately after getting my check to “pay my guys”. At this point I have paid $11,982.01 toward the $14,500 contract, leaving approximately $2517. 01. Although Gerry has made numerous trips to my home, he has not brought me a copy of my signed contract or the second receipt for more materials -$1800. I asked at least 3-4 times for these documents. There was some adjustment to the original design because I did not want the small pickets seated on a huge horizontal 2x6 board. This necessitated a return of the bottom boards in exchange for smaller 2x4 boards which were then placed vertically at top and bottom to hold pickets. At the beginning of the project, I pointed out to the contractor that one of the existing posts had wood rot. Another post was unstable and I approved new posts. I had 7. He put in 14 per code but they were much smaller than original ones. That was ok with me. I have no receipt for the post wood (part of the $1800 I think) but a neighbor-house builder-contractor came by and checked Lowe’s cost for posts between $800-900. Other material might have been in that rounded figure, but again, I have no receipt. All of those posts were installed, but several were then removed because of damaged wood. I don’t feel I should pay labor twice for those posts, nor do I believe that the labor costs boosted my expenses to $18,000, a total figure the contractor jotted on a note paper, but we never discussed a new figure. Last week I asked to meet with the contractor at his convenience and asked again for him to bring my signed contract and receipts for the $1800 for “materials”. He chose 2 pm Friday, but at 3pm, I texted because he was not there. At 3:15 I told him we would need to reschedule. I had 2 appts with stone masons to assess the damage to my stonework. Both were shocked at the damage and explained that flagstone absorbs oil and power washing would not remove all the blotchy stains. They also looked at the pillars and chimney stone which was turned dark from the oil and the gravel in the driveway which was turned black. There were oil drip lines on the stucco walls and a few areas where stones had been broken from the chimney, patio, and a post. They described the procedure for removing stones to replace damaged areas so they would not be “puzzled” in with small pieces. Those areas needed to be rebuilt. Someone glued random stones into the patio and chimney with white apoxy on Friday after 5 pm after I left for dinner. These areas will need to be removed and properly repaired. I contacted an attorney at the suggestion of the stone masons and the staff at Sherman Williams Paint store when I showed them pictures. The staff at Sherman Williams also said the wood should have been dried for 3weeks, even tho it was treated wood. When I texted the contractor that I needed an attorney, he wanted to pressure wash the patio etc and put siding in 2 places and then he would be “finished”. I believe the patio and stonework Will need some significant repairs and the contractor’s liability insurance might need to be explored. I cannot make a further payment until the stone damage has been corrected by a stonework professional and a final figure is fairly negotiated. I don’t think the expense of righting my property damage and getting legal advice to do it is my responsibility."
Brian Craig
Screen porche
Deck with trex
Deck with trex
Response time2 days
Response rate100%
9 neighbors recently requested a quote
Avatar for TNS CONSTRUCTION
TNS CONSTRUCTION
5.0(
8
)
Shed, Barn or Playhouse - Build

Serving Flat Rock, NC and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Extremely professional and great attention to detail, they’re very thorough in the work they provide. It was easy to communicate coordinate with them. Would recommend these guys for all your new build/home improvements needs!"
5 neighbors recently requested a quote
Avatar for BRME
BRME
5.0(
2
)
Shed, Barn or Playhouse - Repair

Serving Flat Rock, NC and surrounding areas

Approved

In business since 2002

Emergency services offered

Warranties offered

"We had used previous vendors and they never seemed to get the job done. The work BRME did has made a significant difference in our water drainage issues on our campus. BRME completed the job exactly as we requested, within the time-frame requested, left no debris or materials behind and the work was high quality. We won't hesitate to call BRME for additional projects."
24x48 Equipment shed - complete
24x48 Equipment Shed - before
Bathroom 1 remodel - before
Bathroom 1 remodel - complete
Bathroom 1 remodel - before

+7

Response time2 days
Response rate100%
Recommended by100%of homeowners
Avatar for TM Projects Wnc
TM Projects Wnc
4.8(
78
)
Shed, Barn or Playhouse - Repair

Serving Flat Rock, NC and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"Trying to do a large Renovation of a mountain house in Waynesville when we live in Florida isn't a easy task unless you have the right people helping - From the first call and through the first project and on to the second and third, Tomas was very easy to work with and reliable - Came when he said he would - called when he had questions - shared pictures along the way - made helpful suggestions - and all affordable even for the "mountain prices" ! When I thought I needed gutters cleaned - he looked - sent a pic and when I said lets do it - it was done that day. My wife is looking for the next project she can hire him for - Would highly recommend"
Gutter Cleaning Project
Shelving for kitchen
Remodeling - General Project
Gutter Cleaning Project
Carpentry work

+99

Recommended by97%of homeowners
Avatar for C & S Construction & Handyman Services
C & S Construction & Handyman Services
5.0(
9
)
Shed, Barn or Playhouse - Repair

Serving Flat Rock, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Excellent work. Replaced storm door on the same day the job was requested. Very competent and made sure everything met my satisfaction. A sl8ght problem with the lower door seal came up the next morning. Called them and Jarad said they fully guaranteed their work and they would be out on Monday (called on Saturday morning)morning to correct the problem. Had some problems with the credit care payment going through the processor, but Jarad was extremely patient and cooperative in fixing the problem. Overall, I highly recommend C&S Construction & Handyman Services for any jobs you have."
Painting - Interior Project
Painting - Interior Project
Kitchen remodel
Handymen Project
Trusses repair and sheet rock hanging and all finish work

+74

Recommended by100%of homeowners
...
Showing 1-10 of 128
Pole Barn Builders questions, answered by experts

There's no simple answer to which is less costly: wood or metal-framed homes. In most cases, metal building components cost more than wooden ones, while entire metal buildings cost less than wooden versions. However, regardless of the exterior framing or structure, each must meet similar building codes. This means that the costs are about the same, even considering that wood will require more maintenance than metal over time.

The best lumber for building will be the strongest and most eco-friendly wood your budget allows. That being said, Douglas fir, pine, oak, and maple are all common building materials. Contractors will use a strong, inexpensive wood to frame a house or other structure and finer woods like mahogany for detail work. 

Yes, barndominiums are designed to withstand strong weather and severe storms if they are built properly by trained professionals. Most barndominiums are made up of a steel structure that can protect a building from winds of up to 150 miles per hour and resist a variety of weather conditions without a major risk of structural damage to the exterior, foundation, or frame.

Choosing a suitable backyard playset that’s age-appropriate and entertaining for your children is worth the cost. A backyard playset you can update and upgrade as your kids grow offers even more benefits. Although a playset won’t substantially increase your home’s value, it won’t negatively affect it either.

The time it takes to build a shed heavily depends on the type of shed you buy. A prefab shed can be built in 4 to 8 hours, while a custom shed will be built off-site over the span of 2 to 5 days. It then takes a few hours, depending on the location, to move the finished shed to its final location.

The Flat Rock, NC homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.