Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Ronan, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Ronan, MT?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Ronan

RV Douglass, Inc.
New to Angi
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Ronan, MT and surrounding areas

In business since 2010

Free estimates

Credit card accepted

RV Douglass, Inc., is your go to for all of your concrete needs! Our dedicated crew has a no-nonsense policy when it comes to getting the job done right the first time, and every time! We are committed to your satisfaction, and we love seeing the look on our customers faces when they see the results we provide! Give us a call today!

Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Most projects take 1-3 hours, with immediate usability after completion.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

The Ronan, MT homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.