Top-rated asphalt driveway pros.

Best asphalt driveway pros near Mound Bayou, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Mound Bayou, MS?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Mound Bayou - Updated Nov 2026

Avatar for Overstreet Construction&roofi.g.l.l.c
Overstreet Construction&roofi.g.l.l.c
4.0(
5
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Mound Bayou, MS and surrounding areas

In business since 1969

Free estimates

Emergency services offered

"

Job was done on the date promised, in the time span estimated and at the price quoted. The two man team properly braced the porch roof before tearing the old column out. They built the new column on site. The team removed all tear down debris as well as the trash from the construction phase (a really big plus in my book since I have had other contractors leave their trash for me to clean up.) The contractor asked for a deposit before they began and the balance after the work was completed. I marked them down on punctuality since they told me that they would be here at 9:00 but it was 90 minutes later before they arrived and another 30 minutes before they started work. As I said above, the work completion was promised for the end of the day and they met that.


"
Additional Photos
Recommended by80%of homeowners
Showing 1-10 of 24
Asphalt Driveways FAQs, answered by experts

Yes, it is possible to pave over an existing driveway, but whether it's the right choice depends on several factors. If the underlying structure of your current driveway is still strong, concrete or asphalt resurfacing can be a cost-effective way to prolong its life. However, if your driveway has significant issues like potholes, deep cracks, or other inconsistencies, it is best to remove the old driveway and start from scratch. Key factors to consider include the current driveway's condition, the compatibility of the new material, the added thickness and height, and the necessary surface preparation.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Regular cleaning, sealing, and timely repair of cracks help maintain its condition.

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Mound Bayou, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.