Top-rated rototilling pros.

Get matched with top rototilling pros in Crowder, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Crowder, MS?

Select your specific project to find the pro for you.

Find Rototilling pros in Crowder

PDOA, a.k.a. Babin Enterprises

No reviews yet

PDOA, a.k.a. Babin Enterprises

No reviews yet
42 years of experience

We provide Commercial, Marine, and Residential/Recreational construction, repair remodel and demolition services. From the Ground to the roof, and from the waterline to the river or lake bottom. All at affordable pricing as related to the work required by our customers. Contractor quality at handyman prices!

We provide Commercial, Marine, and Residential/Recreational construction, repair remodel and demolition services. From the Ground to the roof, and from the waterline to the river or lake bottom. All at affordable pricing as related to the work required by our customers. Contractor quality at handyman prices!


Rototilling questions, answered by experts

The average cost to have rototilling done on your property is around $250, and most homeowners pay between $100 and $350. The total for your rototilling project will depend on the area you need tilled, the quality of the soil, how many roots and shrubs are in the area, and the accessibility of the area. Anything that increases the time to till your soil—like hard clay soil, small entrances to the area that require the use of smaller tools, and roots running through the ground—will all increase your costs.

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"