Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Bogue Chitto, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Bogue Chitto, MS?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Bogue Chitto

Avatar for J And B Equipment, LLC
J And B Equipment, LLC
3.0(
2
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Bogue Chitto, MS and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Wonderful. We had a contractor do us wrong on our roof two years ago. Jonathan and Brandy took the tin off and rebuilt all the braces and fixed it perfect. He and his crew did a wonderful job at a great price. I will call him for anything I need. He does great quality work."
Clean up after storm
Driveway
Clean up after storm
Recommended by50%of homeowners
D's Concrete Works
New to Angi
Concrete - Injection Leveling - Mudjacking

Serving Bogue Chitto, MS and surrounding areas

In business since 2001

D's Concrete Works has over 19 years experience in the field. We pride ourselves on striving to complete your project on schedule and work hard to get the quality you need the first time around. D's Concrete Works provides free estimates. We also want you to know that our project motto is- "Big or Small we do them all!" D's Concrete Works looks forward to meeting with you and assisting with each and every concrete project you have for your home.

Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Generally speaking, push piers—or steel piers—are the best option for underpinning, as they reach down to solid bedrock to find support for your foundation rather than relying on soil, which could be subject to the same issues as the soil directly below your foundation. However, the best underpinning method for your home depends on your location, how far down the bedrock is, and the type of soil in your area. Helical piers are usually the best option for sandy soil or in areas where the bedrock is too deep to use steel piers.

A slurry of cement, sand, and water is injected beneath the concrete to lift and stabilize it.

Concrete leveling is absolutely worth it if you have sunken concrete slabs and want to restore them to level, especially if the slab is part of your home foundation. Concrete leveling is less than half the price of replacing concrete sidewalks, patios, walkways, and pool decks, and it’s about a quarter of the cost of replacing a foundation. If you also treat the underlying problem, it can be a worthwhile and permanent solution.

The Bogue Chitto, MS homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.