Top-rated rototilling pros.

Get matched with top rototilling pros in Cape Fair, MO

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Cape Fair, MO?

Select your specific project to find the pro for you.

Find Rototilling pros in Cape Fair

Handyman28 Services

No reviews yet

Handyman28 Services

No reviews yet
21 years of experience

Well.. i am just me ... i have several references available in most any line of handymane work you would need done .. i am capable of all that is listed, try to keep my jobs to a one to two day minimum due to cheap prices is raised work load, all jobs bid are u buying material, just my labor is the bid.

Well.. i am just me ... i have several references available in most any line of handymane work you would need done .. i am capable of all that is listed, try to keep my jobs to a one to two day minimum due to cheap prices is raised work load, all jobs bid are u buying material, just my labor is the bid.

Rototilling questions, answered by experts

Yes, such as sod installation and erosion control for comprehensive site improvement.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"