Top-rated subcontractors.

Get matched with top subcontractors in Litchfield, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Litchfield, MN?

Select your specific project to find the pro for you.

TRUSTED BY LITCHFIELD, MN HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon31
    Verified subcontracting services reviews

Find Subcontractors in Litchfield

Avatar for Garden Structures & More
Garden Structures & More
4.6(
73
)

Serving Litchfield, MN and surrounding areas

In business since 1998

Free estimates

Emergency services offered

"It's true: working with Hal is not like working with other contractors. With Hal, you are developing a relationship, not fulfilling the terms of a contract. For some that might be more than they want out of a contractor. For me, it was exactly what I needed. Example: I was talking with Hal about another matter when we both happened to notice some rotting boards on our deck. I thought it was unsightly, but nothing serious. Hal persuaded me that, without immediate attention, the rot would spread to the joists underneath, and what was a small problem now would be a big problem later. He replaced the deck boards on time and for the price he quoted. I can now rest assured I won't be plunging through the deck this summer. Along the way, Hal fixed some off-kilter gates in our yard, and also consulted with me about some stains on our stucco (thus managing to solve a problem that had stumped several other contractors). He's always on the end of the line when I have a home repair question. He's been there for me for some five years now. There's plenty of quality workers out there, but not many who will listen as well, contribute as much, and return as often as Hal Morris."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Recommended by95%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Litchfield, MN and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Litchfield, MN and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Betterliving Sunrooms By Portico
Betterliving Sunrooms By Portico
3.7(
41
)

Serving Litchfield, MN and surrounding areas

In business since 2009

Credit card accepted

"The salesmen slow down and no follow up. We had to keep calling to get the work ordered and into the company's shop. Once there, the crew was fast, polite and very knowledgeable."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by69%of homeowners
Showing 1-10 of 19
Subcontractors questions, answered by experts

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

Yes, modular homes offer a wide range of customization options for layout, finishes, and features.

No, space planning is not only relevant for new spaces. With the help of a professional architect, you can still create a space plan for an existing space.

The Litchfield, MN homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.